Healthpeak Properties (DOC) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Healthpeak Properties (DOC) over the last 17 years, with Q4 2025 value amounting to $1.0 billion.
- Healthpeak Properties' Construction in Progress rose 1479.61% to $1.0 billion in Q4 2025 from the same period last year, while for Dec 2025 it was $1.0 billion, marking a year-over-year increase of 1479.61%. This contributed to the annual value of $1.0 billion for FY2025, which is 1479.61% up from last year.
- As of Q4 2025, Healthpeak Properties' Construction in Progress stood at $1.0 billion, which was up 1479.61% from $1.1 billion recorded in Q3 2025.
- Healthpeak Properties' Construction in Progress' 5-year high stood at $1.1 billion during Q3 2025, with a 5-year trough of $642.9 million in Q1 2021.
- Over the past 5 years, Healthpeak Properties' median Construction in Progress value was $797.8 million (recorded in 2023), while the average stood at $821.7 million.
- In the last 5 years, Healthpeak Properties' Construction in Progress surged by 4309.34% in 2021 and then crashed by 1540.57% in 2023.
- Quarter analysis of 5 years shows Healthpeak Properties' Construction in Progress stood at $877.4 million in 2021, then decreased by 13.34% to $760.4 million in 2022, then decreased by 15.41% to $643.2 million in 2023, then skyrocketed by 36.87% to $880.4 million in 2024, then rose by 14.8% to $1.0 billion in 2025.
- Its Construction in Progress stands at $1.0 billion for Q4 2025, versus $1.1 billion for Q3 2025 and $1.0 billion for Q2 2025.