Growth Metrics

Diodes (DIOD) Construction in Progress (2016 - 2025)

Diodes' Construction in Progress history spans 16 years, with the latest figure at $84.5 million for Q4 2025.

  • For Q4 2025, Construction in Progress fell 7.88% year-over-year to $84.5 million; the TTM value through Dec 2025 reached $84.5 million, down 7.88%, while the annual FY2025 figure was $84.5 million, 7.88% down from the prior year.
  • Construction in Progress reached $84.5 million in Q4 2025 per DIOD's latest filing, down from $91.7 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $134.3 million in Q4 2023 to a low of $84.5 million in Q4 2025.
  • Average Construction in Progress over 5 years is $108.6 million, with a median of $112.0 million recorded in 2021.
  • Peak YoY movement for Construction in Progress: soared 148.53% in 2021, then tumbled 31.71% in 2024.
  • A 5-year view of Construction in Progress shows it stood at $112.0 million in 2021, then rose by 7.56% to $120.5 million in 2022, then increased by 11.53% to $134.3 million in 2023, then crashed by 31.71% to $91.7 million in 2024, then decreased by 7.88% to $84.5 million in 2025.
  • Per Business Quant, the three most recent readings for DIOD's Construction in Progress are $84.5 million (Q4 2025), $91.7 million (Q4 2024), and $134.3 million (Q4 2023).