KPIs & Operating Metrics(New)
Growth Metrics

DuPont de Nemours (DD) Construction in Progress (2018 - 2020)

DuPont de Nemours' Construction in Progress history spans 3 years, with the latest figure at $1.5 billion for Q4 2020.

  • For Q4 2020, Construction in Progress fell 6.42% year-over-year to $1.5 billion; the TTM value through Dec 2020 reached $1.5 billion, down 6.42%, while the annual FY2020 figure was $1.5 billion, 6.42% down from the prior year.
  • Construction in Progress reached $1.5 billion in Q4 2020 per DD's latest filing, down from $1.7 billion in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $1.7 billion in Q4 2019 to a low of $1.4 billion in Q2 2019.
  • Average Construction in Progress over 3 years is $1.5 billion, with a median of $1.5 billion recorded in 2018.
  • Peak YoY movement for Construction in Progress: grew 13.31% in 2019, then dropped 6.42% in 2020.
  • A 3-year view of Construction in Progress shows it stood at $1.5 billion in 2018, then increased by 13.31% to $1.7 billion in 2019, then decreased by 6.42% to $1.5 billion in 2020.
  • Per Business Quant, the three most recent readings for DD's Construction in Progress are $1.5 billion (Q4 2020), $1.7 billion (Q4 2019), and $1.4 billion (Q3 2019).