Cenovus Energy (CVE) Construction in Progress (2016 - 2025)

Cenovus Energy's Construction in Progress history spans 10 years, with the latest figure at $1.7 billion for Q4 2025.

  • For Q4 2025, Construction in Progress fell 35.64% year-over-year to $1.7 billion; the TTM value through Dec 2025 reached $1.7 billion, down 35.64%, while the annual FY2025 figure was $1.7 billion, 37.05% down from the prior year.
  • Construction in Progress for Q4 2025 was $1.7 billion at Cenovus Energy, down from $2.7 billion in the prior quarter.
  • Across five years, Construction in Progress topped out at $2.7 billion in Q4 2024 and bottomed at $1.7 billion in Q4 2022.
  • The 5-year median for Construction in Progress is $2.0 billion (2023), against an average of $2.2 billion.
  • The largest annual shift saw Construction in Progress surged 70.83% in 2021 before it tumbled 36.98% in 2022.
  • A 5-year view of Construction in Progress shows it stood at $2.7 billion in 2021, then crashed by 36.98% to $1.7 billion in 2022, then grew by 20.31% to $2.0 billion in 2023, then soared by 33.21% to $2.7 billion in 2024, then crashed by 35.64% to $1.7 billion in 2025.
  • Per Business Quant, the three most recent readings for CVE's Construction in Progress are $1.7 billion (Q4 2025), $2.7 billion (Q4 2024), and $2.0 billion (Q4 2023).