Cenovus Energy (CVE) Construction in Progress (2016 - 2025)
Cenovus Energy (CVE) has disclosed Construction in Progress for 10 consecutive years, with $1.7 billion as the latest value for Q4 2025.
- Quarterly Construction in Progress fell 35.64% to $1.7 billion in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $1.7 billion through Dec 2025, down 35.64% year-over-year, with the annual reading at $1.7 billion for FY2025, 35.64% down from the prior year.
- Construction in Progress hit $1.7 billion in Q4 2025 for Cenovus Energy, down from $2.7 billion in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $2.7 billion in Q4 2024 to a low of $1.7 billion in Q4 2022.
- Historically, Construction in Progress has averaged $2.2 billion across 5 years, with a median of $2.0 billion in 2023.
- Biggest five-year swings in Construction in Progress: soared 70.83% in 2021 and later tumbled 36.98% in 2022.
- Year by year, Construction in Progress stood at $2.7 billion in 2021, then crashed by 36.98% to $1.7 billion in 2022, then rose by 20.31% to $2.0 billion in 2023, then soared by 33.21% to $2.7 billion in 2024, then plummeted by 35.64% to $1.7 billion in 2025.
- Business Quant data shows Construction in Progress for CVE at $1.7 billion in Q4 2025, $2.7 billion in Q4 2024, and $2.0 billion in Q4 2023.