Cn Energy (CNEY) Construction in Progress (2020 - 2023)
Historic Construction in Progress for Cn Energy (CNEY) over the last 4 years, with Q3 2023 value amounting to $5.2 million.
- Cn Energy's Construction in Progress fell 250.14% to $5.2 million in Q3 2023 from the same period last year, while for Sep 2023 it was $5.2 million, marking a year-over-year decrease of 250.14%. This contributed to the annual value of $5.2 million for FY2023, which is 250.14% down from last year.
- According to the latest figures from Q3 2023, Cn Energy's Construction in Progress is $5.2 million, which was down 250.14% from $5.3 million recorded in Q3 2022.
- Cn Energy's 5-year Construction in Progress high stood at $5.3 million for Q3 2022, and its period low was $5.2 million during Q3 2023.
- Moreover, its 4-year median value for Construction in Progress was $5.2 million (2020), whereas its average is $5.2 million.
- Its Construction in Progress has fluctuated over the past 5 years, first soared by 78.11% in 2022, then tumbled by 250.14% in 2023.
- Over the past 4 years, Cn Energy's Construction in Progress (Quarter) stood at $5.2 million in 2020, then grew by 0.29% to $5.3 million in 2021, then grew by 0.78% to $5.3 million in 2022, then fell by 2.5% to $5.2 million in 2023.
- Its last three reported values are $5.2 million in Q3 2023, $5.3 million for Q3 2022, and $5.3 million during Q3 2021.