Growth Metrics

Cabot (CBT) Construction in Progress (2010 - 2025)

Cabot (CBT) reported Construction in Progress of $457.0 million for Q3 2025, up 16.58% year-over-year from $392.0 million in Q3 2024, and up 16.58% on a QoQ basis from $392.0 million in Q3 2024.

Cabot (CBT) has 16 years of Construction in Progress data on file, last reported at $457.0 million in Q3 2025.

  • Quarterly Construction in Progress rose 16.58% year-over-year to $457.0 million in Q3 2025, while the trailing twelve-month figure through Sep 2025 was $457.0 million (up 16.58% YoY) and the FY2025 annual result came in at $457.0 million, up 16.58% from the prior year.
  • Construction in Progress improved to $457.0 million in Q3 2025 per CBT's latest filing, from $392.0 million in the prior quarter.
  • Across five years, Construction in Progress topped out at $457.0 million in Q3 2025 and bottomed at $190.0 million in Q3 2021.
  • The 5-year median for Construction in Progress is $329.0 million (2023), against an average of $318.4 million.
  • The widest annual swing landed in 2021, when Construction in Progress changed 0.0%; it then surged 46.88% in 2023.
  • Tracing CBT's Construction in Progress over 5 years: stood at $190.0 million in 2021, then grew by 17.89% to $224.0 million in 2022, then surged by 46.88% to $329.0 million in 2023, then climbed by 19.15% to $392.0 million in 2024, then advanced by 16.58% to $457.0 million in 2025.
  • Per Business Quant, the three latest CBT Construction in Progress figures stand at $457.0 million (Q3 2025), $392.0 million (Q3 2024), and $329.0 million (Q3 2023).

Historic Data

Download Data 🔒
DateValue
Sep 30, 2025 457.00 Mn
Sep 30, 2024 392.00 Mn
Sep 30, 2023 329.00 Mn
Sep 30, 2022 224.00 Mn
Sep 30, 2021 190.00 Mn
Sep 30, 2020 190.00 Mn
Sep 30, 2019 262.00 Mn
Sep 30, 2018 242.00 Mn
Sep 30, 2017 150.00 Mn
Sep 30, 2016 88.00 Mn
Sep 30, 2015 106.00 Mn
Sep 30, 2014 216.00 Mn
Sep 30, 2013 278.00 Mn
Sep 30, 2012 244.00 Mn
Sep 30, 2011 177.00 Mn
Sep 30, 2010 102.00 Mn