Cabot (CBT) Construction in Progress (2016 - 2025)
Cabot (CBT) has disclosed Construction in Progress for 16 consecutive years, with $457.0 million as the latest value for Q3 2025.
- On a quarterly basis, Construction in Progress rose 16.58% to $457.0 million in Q3 2025 year-over-year; TTM through Sep 2025 was $457.0 million, a 16.58% increase, with the full-year FY2025 number at $457.0 million, up 16.58% from a year prior.
- Construction in Progress was $457.0 million for Q3 2025 at Cabot, up from $392.0 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $457.0 million in Q3 2025 to a low of $190.0 million in Q3 2021.
- A 5-year average of $318.4 million and a median of $329.0 million in 2023 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: changed 0.0% in 2021, then skyrocketed 46.88% in 2023.
- Cabot's Construction in Progress stood at $190.0 million in 2021, then grew by 17.89% to $224.0 million in 2022, then surged by 46.88% to $329.0 million in 2023, then rose by 19.15% to $392.0 million in 2024, then increased by 16.58% to $457.0 million in 2025.
- Per Business Quant, the three most recent readings for CBT's Construction in Progress are $457.0 million (Q3 2025), $392.0 million (Q3 2024), and $329.0 million (Q3 2023).