Growth Metrics

Camtek (CAMT) Construction in Progress (2019 - 2025)

Historic Construction in Progress for Camtek (CAMT) over the last 7 years, with Q2 2025 value amounting to $499.0.

  • Camtek's Construction in Progress rose 1577.73% to $499.0 in Q2 2025 from the same period last year, while for Jun 2025 it was $499.0, marking a year-over-year increase of 1577.73%. This contributed to the annual value of $431.0 for FY2024, which is 46.62% up from last year.
  • Latest data reveals that Camtek reported Construction in Progress of $499.0 as of Q2 2025, which was up 1577.73% from $431.0 recorded in Q4 2024.
  • In the past 5 years, Camtek's Construction in Progress ranged from a high of $396000.0 in Q4 2022 and a low of $429.0 during Q4 2023
  • In the last 5 years, Camtek's Construction in Progress had a median value of $489.0 in 2021 and averaged $134408.6.
  • In the last 5 years, Camtek's Construction in Progress skyrocketed by 45057.47% in 2021 and then tumbled by 9989.17% in 2023.
  • Quarter analysis of 5 years shows Camtek's Construction in Progress stood at $479.0 in 2021, then soared by 82572.23% to $396000.0 in 2022, then plummeted by 99.89% to $429.0 in 2023, then rose by 0.47% to $431.0 in 2024, then rose by 15.78% to $499.0 in 2025.
  • Its last three reported values are $499.0 in Q2 2025, $431.0 for Q4 2024, and $431.0 during Q2 2024.