Brightstar Lottery (BRSL) Construction in Progress (2024 - 2025)
Brightstar Lottery (BRSL) has disclosed Construction in Progress for 2 consecutive years, with $5.0 million as the latest value for Q4 2025.
- On a quarterly basis, Construction in Progress fell 84.38% to $5.0 million in Q4 2025 year-over-year; TTM through Dec 2025 was $5.0 million, a 84.38% decrease, with the full-year FY2025 number at $5.0 million, down 84.38% from a year prior.
- Construction in Progress was $5.0 million for Q4 2025 at Brightstar Lottery, down from $32.0 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $32.0 million in Q4 2024 to a low of $5.0 million in Q4 2025.