Borr Drilling (BORR) Construction in Progress (2018 - 2024)
Historic Construction in Progress for Borr Drilling (BORR) over the last 7 years, with Q3 2024 value amounting to $169.2 million.
- Borr Drilling's Construction in Progress rose 473428.57% to $169.2 million in Q3 2024 from the same period last year, while for Sep 2024 it was $169.2 million, marking a year-over-year increase of 473428.57%. This contributed to the annual value of $5.4 million for FY2023, which is 5428.57% up from last year.
- Borr Drilling's Construction in Progress amounted to $169.2 million in Q3 2024, which was up 473428.57% from $23.4 million recorded in Q2 2024.
- In the past 5 years, Borr Drilling's Construction in Progress registered a high of $201.4 million during Q1 2020, and its lowest value of $3.5 million during Q3 2022.
- In the last 5 years, Borr Drilling's Construction in Progress had a median value of $135.5 million in 2020 and averaged $80.3 million.
- As far as peak fluctuations go, Borr Drilling's Construction in Progress tumbled by 9741.7% in 2022, and later skyrocketed by 473428.57% in 2024.
- Borr Drilling's Construction in Progress (Quarter) stood at $135.5 million in 2020, then changed by 0.0% to $135.5 million in 2021, then tumbled by 97.42% to $3.5 million in 2022, then soared by 54.29% to $5.4 million in 2023, then skyrocketed by 3033.33% to $169.2 million in 2024.
- Its Construction in Progress was $169.2 million in Q3 2024, compared to $23.4 million in Q2 2024 and $12.9 million in Q1 2024.