Bon Natural Life (BON) Construction in Progress (2021 - 2023)

Bon Natural Life (BON) has disclosed Construction in Progress for 3 consecutive years, with $5.0 million as the latest value for Q3 2023.

  • Quarterly Construction in Progress rose 586.37% to $5.0 million in Q3 2023 from the year-ago period, while the trailing twelve-month figure was $5.0 million through Sep 2023, up 586.37% year-over-year, with the annual reading at $5.0 million for FY2023, 586.37% up from the prior year.
  • Construction in Progress for Q3 2023 was $5.0 million at Bon Natural Life, up from $728470.0 in the prior quarter.
  • The five-year high for Construction in Progress was $13.4 million in Q3 2021, with the low at $728470.0 in Q3 2022.
  • Average Construction in Progress over 3 years is $6.4 million, with a median of $5.0 million recorded in 2023.
  • The sharpest move saw Construction in Progress crashed 94.56% in 2022, then skyrocketed 586.37% in 2023.
  • Over 3 years, Construction in Progress stood at $13.4 million in 2021, then plummeted by 94.56% to $728470.0 in 2022, then surged by 586.37% to $5.0 million in 2023.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $5.0 million, $728470.0, and $13.4 million for Q3 2023, Q3 2022, and Q3 2021 respectively.