Biogen (BIIB) Construction in Progress (2016 - 2024)
Historic Construction in Progress for Biogen (BIIB) over the last 17 years, with Q4 2025 value amounting to $163.1 million.
- Biogen's Construction in Progress fell 4711.41% to $163.1 million in Q4 2025 from the same period last year, while for Dec 2025 it was $163.1 million, marking a year-over-year decrease of 4711.41%. This contributed to the annual value of $163.1 million for FY2025, which is 4711.41% down from last year.
- Latest data reveals that Biogen reported Construction in Progress of $163.1 million as of Q4 2025, which was down 4711.41% from $308.4 million recorded in Q4 2024.
- Biogen's 5-year Construction in Progress high stood at $1.9 billion for Q1 2021, and its period low was $163.1 million during Q4 2025.
- Over the past 5 years, Biogen's median Construction in Progress value was $711.1 million (recorded in 2022), while the average stood at $754.1 million.
- As far as peak fluctuations go, Biogen's Construction in Progress skyrocketed by 1538.36% in 2022, and later tumbled by 6838.22% in 2024.
- Quarter analysis of 5 years shows Biogen's Construction in Progress stood at $770.3 million in 2021, then rose by 15.38% to $888.8 million in 2022, then grew by 9.74% to $975.4 million in 2023, then plummeted by 68.38% to $308.4 million in 2024, then crashed by 47.11% to $163.1 million in 2025.
- Its Construction in Progress was $163.1 million in Q4 2025, compared to $308.4 million in Q4 2024 and $975.4 million in Q4 2023.