Bgm (BGM) Construction in Progress (2019 - 2025)

Historic Construction in Progress for Bgm (BGM) over the last 7 years, with Q1 2025 value amounting to $3.9 million.

  • Bgm's Construction in Progress rose 631.47% to $3.9 million in Q1 2025 from the same period last year, while for Mar 2025 it was $3.9 million, marking a year-over-year increase of 631.47%. This contributed to the annual value of $5.6 million for FY2024, which is 9667.67% up from last year.
  • As of Q1 2025, Bgm's Construction in Progress stood at $3.9 million, which was up 631.47% from $5.6 million recorded in Q3 2024.
  • In the past 5 years, Bgm's Construction in Progress registered a high of $5.6 million during Q3 2024, and its lowest value of $1.2 million during Q3 2022.
  • For the 5-year period, Bgm's Construction in Progress averaged around $3.2 million, with its median value being $3.3 million (2023).
  • As far as peak fluctuations go, Bgm's Construction in Progress surged by 117092.75% in 2021, and later tumbled by 4066.89% in 2022.
  • Over the past 5 years, Bgm's Construction in Progress (Quarter) stood at $2.0 million in 2021, then plummeted by 40.67% to $1.2 million in 2022, then surged by 139.22% to $2.9 million in 2023, then soared by 96.68% to $5.6 million in 2024, then plummeted by 31.27% to $3.9 million in 2025.
  • Its last three reported values are $3.9 million in Q1 2025, $5.6 million for Q3 2024, and $3.6 million during Q1 2024.