Saul Centers (BFS) Construction in Progress (2016 - 2025)

Saul Centers has reported Construction in Progress over the past 14 years, most recently at $110.0 million for Q4 2025.

  • Quarterly results put Construction in Progress at $110.0 million for Q4 2025, down 66.29% from a year ago — trailing twelve months through Dec 2025 was $110.0 million (down 66.29% YoY), and the annual figure for FY2025 was $110.0 million, down 66.29%.
  • Construction in Progress for Q4 2025 was $110.0 million at Saul Centers, down from $371.5 million in the prior quarter.
  • Over the last five years, Construction in Progress for BFS hit a ceiling of $653.2 million in Q3 2024 and a floor of $110.0 million in Q4 2025.
  • Median Construction in Progress over the past 5 years was $331.8 million (2024), compared with a mean of $345.7 million.
  • Biggest five-year swings in Construction in Progress: skyrocketed 196.37% in 2021 and later plummeted 66.29% in 2025.
  • Saul Centers' Construction in Progress stood at $205.9 million in 2021, then soared by 56.49% to $322.2 million in 2022, then soared by 59.69% to $514.6 million in 2023, then crashed by 36.61% to $326.2 million in 2024, then plummeted by 66.29% to $110.0 million in 2025.
  • The last three reported values for Construction in Progress were $110.0 million (Q4 2025), $371.5 million (Q3 2025), and $356.5 million (Q2 2025) per Business Quant data.