Mobile Infrastructure (BEEP) Construction in Progress (2022 - 2025)
Historic Construction in Progress for Mobile Infrastructure (BEEP) over the last 4 years, with Q3 2025 value amounting to $260000.0.
- Mobile Infrastructure's Construction in Progress rose 71250.0% to $260000.0 in Q3 2025 from the same period last year, while for Sep 2025 it was $260000.0, marking a year-over-year increase of 71250.0%. This contributed to the annual value of $13000.0 for FY2024, which is 9566.67% down from last year.
- Per Mobile Infrastructure's latest filing, its Construction in Progress stood at $260000.0 for Q3 2025, which was up 71250.0% from $92000.0 recorded in Q2 2025.
- In the past 5 years, Mobile Infrastructure's Construction in Progress ranged from a high of $1.2 million in Q4 2022 and a low of $13000.0 during Q4 2024
- Moreover, its 4-year median value for Construction in Progress was $260000.0 (2025), whereas its average is $403444.4.
- Its Construction in Progress has fluctuated over the past 5 years, first tumbled by 9730.87% in 2024, then surged by 71250.0% in 2025.
- Over the past 4 years, Mobile Infrastructure's Construction in Progress (Quarter) stood at $1.2 million in 2022, then tumbled by 75.12% to $300000.0 in 2023, then tumbled by 95.67% to $13000.0 in 2024, then surged by 1900.0% to $260000.0 in 2025.
- Its last three reported values are $260000.0 in Q3 2025, $92000.0 for Q2 2025, and $13000.0 during Q4 2024.