Growth Metrics

Bath & Body Works (BBWI) Construction in Progress (2017 - 2026)

Bath & Body Works has reported Construction in Progress over the past 17 years, most recently at $36.0 million for Q1 2026.

  • Quarterly Construction in Progress fell 2.7% to $36.0 million in Q1 2026 from the year-ago period, while the trailing twelve-month figure was $36.0 million through Jan 2026, down 2.7% year-over-year, with the annual reading at $36.0 million for FY2026, 2.7% down from the prior year.
  • Construction in Progress was $36.0 million for Q1 2026 at Bath & Body Works, down from $37.0 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $73.0 million in Q1 2023 and troughed at $36.0 million in Q1 2026.
  • The 5-year median for Construction in Progress is $43.0 million (2024), against an average of $50.4 million.
  • Year-over-year, Construction in Progress surged 320.0% in 2022 and then tumbled 41.1% in 2024.
  • A 5-year view of Construction in Progress shows it stood at $63.0 million in 2022, then grew by 15.87% to $73.0 million in 2023, then tumbled by 41.1% to $43.0 million in 2024, then fell by 13.95% to $37.0 million in 2025, then fell by 2.7% to $36.0 million in 2026.
  • Per Business Quant, the three most recent readings for BBWI's Construction in Progress are $36.0 million (Q1 2026), $37.0 million (Q1 2025), and $43.0 million (Q1 2024).