Growth Metrics

Bath & Body Works (BBWI) Construction in Progress (2017 - 2025)

Historic Construction in Progress for Bath & Body Works (BBWI) over the last 16 years, with Q1 2025 value amounting to $37.0 million.

  • Bath & Body Works' Construction in Progress fell 1395.35% to $37.0 million in Q1 2025 from the same period last year, while for Feb 2025 it was $37.0 million, marking a year-over-year decrease of 1395.35%. This contributed to the annual value of $37.0 million for FY2025, which is 1395.35% down from last year.
  • As of Q1 2025, Bath & Body Works' Construction in Progress stood at $37.0 million, which was down 1395.35% from $43.0 million recorded in Q1 2024.
  • Bath & Body Works' 5-year Construction in Progress high stood at $73.0 million for Q1 2023, and its period low was $15.0 million during Q1 2021.
  • Over the past 5 years, Bath & Body Works' median Construction in Progress value was $43.0 million (recorded in 2024), while the average stood at $46.2 million.
  • In the last 5 years, Bath & Body Works' Construction in Progress tumbled by 8770.49% in 2021 and then surged by 32000.0% in 2022.
  • Quarter analysis of 5 years shows Bath & Body Works' Construction in Progress stood at $15.0 million in 2021, then soared by 320.0% to $63.0 million in 2022, then rose by 15.87% to $73.0 million in 2023, then crashed by 41.1% to $43.0 million in 2024, then decreased by 13.95% to $37.0 million in 2025.
  • Its Construction in Progress was $37.0 million in Q1 2025, compared to $43.0 million in Q1 2024 and $73.0 million in Q1 2023.