Growth Metrics

Kimberly Clark (KMB) Construction in Progress (2016 - 2025)

Kimberly Clark has reported Construction in Progress over the past 17 years, most recently at $1.2 billion for Q4 2025.

  • Quarterly results put Construction in Progress at $1.2 billion for Q4 2025, up 53.97% from a year ago — trailing twelve months through Dec 2025 was $1.2 billion (up 53.97% YoY), and the annual figure for FY2025 was $1.2 billion, up 53.97%.
  • Construction in Progress for Q4 2025 was $1.2 billion at Kimberly Clark, up from $960.0 million in the prior quarter.
  • Over the last five years, Construction in Progress for KMB hit a ceiling of $1.2 billion in Q4 2025 and a floor of $633.0 million in Q2 2021.
  • Median Construction in Progress over the past 5 years was $763.0 million (2021), compared with a mean of $771.5 million.
  • Biggest five-year swings in Construction in Progress: dropped 23.37% in 2021 and later soared 53.97% in 2025.
  • Kimberly Clark's Construction in Progress stood at $760.0 million in 2021, then fell by 11.05% to $676.0 million in 2022, then increased by 18.79% to $803.0 million in 2023, then fell by 2.86% to $780.0 million in 2024, then surged by 53.97% to $1.2 billion in 2025.
  • The last three reported values for Construction in Progress were $1.2 billion (Q4 2025), $960.0 million (Q3 2025), and $824.0 million (Q2 2025) per Business Quant data.