Growth Metrics

Kimberly Clark (KMB) Construction in Progress (2016 - 2026)

Kimberly Clark has reported Construction in Progress over the past 18 years, most recently at $1.3 billion for Q1 2026.

  • For Q1 2026, Construction in Progress rose 55.64% year-over-year to $1.3 billion; the TTM value through Mar 2026 reached $1.3 billion, up 55.64%, while the annual FY2025 figure was $1.2 billion, 53.97% up from the prior year.
  • Construction in Progress for Q1 2026 was $1.3 billion at Kimberly Clark, up from $1.2 billion in the prior quarter.
  • Over five years, Construction in Progress peaked at $1.3 billion in Q1 2026 and troughed at $647.0 million in Q3 2022.
  • A 5-year average of $815.8 million and a median of $781.0 million in 2024 define the central range for Construction in Progress.
  • Biggest five-year swings in Construction in Progress: fell 12.79% in 2023 and later surged 55.64% in 2026.
  • Year by year, Construction in Progress stood at $676.0 million in 2022, then rose by 18.79% to $803.0 million in 2023, then dropped by 2.86% to $780.0 million in 2024, then soared by 53.97% to $1.2 billion in 2025, then rose by 5.75% to $1.3 billion in 2026.
  • Business Quant data shows Construction in Progress for KMB at $1.3 billion in Q1 2026, $1.2 billion in Q4 2025, and $960.0 million in Q3 2025.