BLACKBERRY (BB) Construction in Progress: 2009-2019
Historic Construction in Progress for BLACKBERRY (BB) over the last 11 years, with Feb 2019 value amounting to $4.0 billion.
- BLACKBERRY's Construction in Progress rose 6.45% to $3.9 billion in Q4 2019 from the same period last year, while for Nov 2019 it was $3.9 billion, marking a year-over-year increase of 6.45%. This contributed to the annual value of $4.0 billion for FY2019, which is 4.97% up from last year.
- As of FY2019, BLACKBERRY's Construction in Progress stood at $4.0 billion, which was up 4.97% from $3.8 billion recorded in FY2018.
- BLACKBERRY's 5-year Construction in Progress high stood at $5.5 billion for FY2016, and its period low was $6,549 during FY2015.
- Its 3-year average for Construction in Progress is $3.7 billion, with a median of $3.8 billion in 2018.
- As far as peak fluctuations go, BLACKBERRY's Construction in Progress skyrocketed by 84,501,350.60% in 2016, and later crashed by 40.44% in 2017.
- Yearly analysis of 5 years shows BLACKBERRY's Construction in Progress stood at $6,549 in 2015, then skyrocketed by 84,501,350.60% to $5.5 billion in 2016, then crashed by 40.44% to $3.3 billion in 2017, then climbed by 14.68% to $3.8 billion in 2018, then climbed by 4.97% to $4.0 billion in 2019.