BLACKBERRY (BB) Construction in Progress: 2009-2019
Historic Construction in Progress for BLACKBERRY (BB) over the last 11 years, with Nov 2019 value amounting to $3.9 billion.
- BLACKBERRY's Construction in Progress rose 6.45% to $3.9 billion in Q4 2019 from the same period last year, while for Nov 2019 it was $3.9 billion, marking a year-over-year increase of 6.45%. This contributed to the annual value of $4.0 billion for FY2019, which is 4.97% up from last year.
- Latest data reveals that BLACKBERRY reported Construction in Progress of $3.9 billion as of Q4 2019, which was down 0.51% from $3.9 billion recorded in Q3 2019.
- BLACKBERRY's Construction in Progress' 5-year high stood at $5.9 billion during Q4 2015, with a 5-year trough of $658 in Q2 2015.
- For the 3-year period, BLACKBERRY's Construction in Progress averaged around $3.3 billion, with its median value being $3.8 billion (2018).
- As far as peak fluctuations go, BLACKBERRY's Construction in Progress crashed by 100.00% in 2015, and later skyrocketed by 378,745,544.60% in 2016.
- Quarterly analysis of 5 years shows BLACKBERRY's Construction in Progress stood at $5.9 billion in 2015, then tumbled by 43.10% to $3.4 billion in 2016, then slumped by 74.49% to $855.0 million in 2017, then surged by 329.94% to $3.7 billion in 2018, then increased by 6.45% to $3.9 billion in 2019.
- Its last three reported values are $3.9 billion in Q4 2019, $3.9 billion for Q3 2019, and $4.0 billion during Q2 2019.