Armstrong World Industries (AWI) Construction in Progress (2016 - 2025)
Armstrong World Industries' Construction in Progress history spans 12 years, with the latest figure at $72.6 million for Q4 2025.
- For Q4 2025, Construction in Progress rose 45.2% year-over-year to $72.6 million; the TTM value through Dec 2025 reached $72.6 million, up 45.2%, while the annual FY2025 figure was $72.6 million, 45.2% up from the prior year.
- Construction in Progress for Q4 2025 was $72.6 million at Armstrong World Industries, up from $50.0 million in the prior quarter.
- Across five years, Construction in Progress topped out at $72.6 million in Q4 2025 and bottomed at $49.0 million in Q4 2022.
- The 5-year median for Construction in Progress is $51.3 million (2021), against an average of $56.9 million.
- The largest annual shift saw Construction in Progress dropped 18.96% in 2024 before it soared 45.2% in 2025.
- A 5-year view of Construction in Progress shows it stood at $51.3 million in 2021, then decreased by 4.48% to $49.0 million in 2022, then increased by 25.92% to $61.7 million in 2023, then decreased by 18.96% to $50.0 million in 2024, then skyrocketed by 45.2% to $72.6 million in 2025.
- Per Business Quant, the three most recent readings for AWI's Construction in Progress are $72.6 million (Q4 2025), $50.0 million (Q4 2024), and $61.7 million (Q4 2023).