Johnson Controls International (JCI) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Johnson Controls International (JCI) over the last 10 years, with Q3 2025 value amounting to $382.0 million.
- Johnson Controls International's Construction in Progress fell 861.24% to $382.0 million in Q3 2025 from the same period last year, while for Sep 2025 it was $382.0 million, marking a year-over-year decrease of 861.24%. This contributed to the annual value of $382.0 million for FY2025, which is 861.24% down from last year.
- Per Johnson Controls International's latest filing, its Construction in Progress stood at $382.0 million for Q3 2025, which was down 861.24% from $418.0 million recorded in Q3 2024.
- Johnson Controls International's 5-year Construction in Progress high stood at $514.0 million for Q3 2022, and its period low was $382.0 million during Q3 2025.
- Its 5-year average for Construction in Progress is $451.2 million, with a median of $442.0 million in 2023.
- Per our database at Business Quant, Johnson Controls International's Construction in Progress soared by 5290.52% in 2021 and then tumbled by 1400.78% in 2023.
- Over the past 5 years, Johnson Controls International's Construction in Progress (Quarter) stood at $500.0 million in 2021, then grew by 2.8% to $514.0 million in 2022, then dropped by 14.01% to $442.0 million in 2023, then decreased by 5.43% to $418.0 million in 2024, then dropped by 8.61% to $382.0 million in 2025.
- Its last three reported values are $382.0 million in Q3 2025, $418.0 million for Q3 2024, and $442.0 million during Q3 2023.