KPIs & Operating Metrics(New)
Growth Metrics

Johnson Controls International (JCI) Construction in Progress (2016 - 2025)

Johnson Controls International (JCI) has disclosed Construction in Progress for 10 consecutive years, with $382.0 million as the latest value for Q3 2025.

  • On a quarterly basis, Construction in Progress fell 8.61% to $382.0 million in Q3 2025 year-over-year; TTM through Sep 2025 was $382.0 million, a 8.61% decrease, with the full-year FY2025 number at $382.0 million, down 8.61% from a year prior.
  • Construction in Progress was $382.0 million for Q3 2025 at Johnson Controls International, down from $418.0 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $514.0 million in Q3 2022 to a low of $382.0 million in Q3 2025.
  • A 5-year average of $451.2 million and a median of $442.0 million in 2023 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: surged 52.91% in 2021, then fell 14.01% in 2023.
  • Johnson Controls International's Construction in Progress stood at $500.0 million in 2021, then rose by 2.8% to $514.0 million in 2022, then dropped by 14.01% to $442.0 million in 2023, then decreased by 5.43% to $418.0 million in 2024, then decreased by 8.61% to $382.0 million in 2025.
  • Per Business Quant, the three most recent readings for JCI's Construction in Progress are $382.0 million (Q3 2025), $418.0 million (Q3 2024), and $442.0 million (Q3 2023).