Avalonbay Communities (AVB) Construction in Progress (2016 - 2025)
Avalonbay Communities' Construction in Progress history spans 17 years, with the latest figure at $1.5 billion for Q4 2025.
- For Q4 2025, Construction in Progress rose 39.91% year-over-year to $1.5 billion; the TTM value through Dec 2025 reached $1.5 billion, up 39.91%, while the annual FY2025 figure was $1.5 billion, 39.91% up from the prior year.
- Construction in Progress reached $1.5 billion in Q4 2025 per AVB's latest filing, up from $1.4 billion in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $1.5 billion in Q4 2025 to a low of $755.3 million in Q1 2022.
- Average Construction in Progress over 5 years is $1.1 billion, with a median of $1.1 billion recorded in 2024.
- Peak YoY movement for Construction in Progress: tumbled 39.16% in 2021, then skyrocketed 60.39% in 2023.
- A 5-year view of Construction in Progress shows it stood at $807.1 million in 2021, then surged by 32.89% to $1.1 billion in 2022, then grew by 18.31% to $1.3 billion in 2023, then dropped by 17.83% to $1.0 billion in 2024, then surged by 39.91% to $1.5 billion in 2025.
- Per Business Quant, the three most recent readings for AVB's Construction in Progress are $1.5 billion (Q4 2025), $1.4 billion (Q3 2025), and $1.4 billion (Q2 2025).