KPIs & Operating Metrics(New)

Avalonbay Communities (AVB) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Avalonbay Communities (AVB) over the last 17 years, with Q3 2025 value amounting to $1.4 billion.

  • Avalonbay Communities' Construction in Progress rose 3124.61% to $1.4 billion in Q3 2025 from the same period last year, while for Sep 2025 it was $1.4 billion, marking a year-over-year increase of 3124.61%. This contributed to the annual value of $1.0 billion for FY2024, which is 1782.96% down from last year.
  • Avalonbay Communities' Construction in Progress amounted to $1.4 billion in Q3 2025, which was up 3124.61% from $1.4 billion recorded in Q2 2025.
  • In the past 5 years, Avalonbay Communities' Construction in Progress ranged from a high of $1.4 billion in Q3 2025 and a low of $755.3 million during Q1 2022
  • For the 5-year period, Avalonbay Communities' Construction in Progress averaged around $1.1 billion, with its median value being $1.1 billion (2024).
  • Its Construction in Progress has fluctuated over the past 5 years, first tumbled by 3916.4% in 2021, then skyrocketed by 6039.28% in 2023.
  • Quarter analysis of 5 years shows Avalonbay Communities' Construction in Progress stood at $807.1 million in 2021, then surged by 32.89% to $1.1 billion in 2022, then increased by 18.31% to $1.3 billion in 2023, then fell by 17.83% to $1.0 billion in 2024, then surged by 37.01% to $1.4 billion in 2025.
  • Its last three reported values are $1.4 billion in Q3 2025, $1.4 billion for Q2 2025, and $1.2 billion during Q1 2025.