Anterix (ATEX) Construction in Progress (2016 - 2023)
Historic Construction in Progress for Anterix (ATEX) over the last 10 years, with Q1 2023 value amounting to $547000.0.
- Anterix's Construction in Progress rose 12791.67% to $547000.0 in Q1 2023 from the same period last year, while for Mar 2023 it was $547000.0, marking a year-over-year increase of 12791.67%. This contributed to the annual value of $547000.0 for FY2023, which is 12791.67% up from last year.
- Per Anterix's latest filing, its Construction in Progress stood at $547000.0 for Q1 2023, which was up 12791.67% from $240000.0 recorded in Q1 2022.
- Anterix's 5-year Construction in Progress high stood at $547000.0 for Q1 2023, and its period low was $10000.0 during Q1 2021.
- For the 5-year period, Anterix's Construction in Progress averaged around $162250.0, with its median value being $85000.0 (2019).
- Its Construction in Progress has fluctuated over the past 5 years, first plummeted by 9646.18% in 2019, then soared by 230000.0% in 2022.
- Quarter analysis of 5 years shows Anterix's Construction in Progress stood at $86000.0 in 2019, then tumbled by 66.28% to $29000.0 in 2020, then plummeted by 65.52% to $10000.0 in 2021, then surged by 2300.0% to $240000.0 in 2022, then soared by 127.92% to $547000.0 in 2023.
- Its Construction in Progress stands at $547000.0 for Q1 2023, versus $240000.0 for Q1 2022 and $10000.0 for Q1 2021.