AST SpaceMobile (ASTS) Construction in Progress: 2020-2024

Historic Construction in Progress for AST SpaceMobile (ASTS) over the last 5 years, with Dec 2024 value amounting to $121.0 million.

  • AST SpaceMobile's Construction in Progress rose 303.71% to $754.8 million in Q3 2025 from the same period last year, while for Sep 2025 it was $754.8 million, marking a year-over-year increase of 303.71%. This contributed to the annual value of $121.0 million for FY2024, which is 3.54% down from last year.
  • Latest data reveals that AST SpaceMobile reported Construction in Progress of $121.0 million as of FY2024, which was down 3.54% from $125.4 million recorded in FY2023.
  • AST SpaceMobile's Construction in Progress' 5-year high stood at $125.4 million during FY2023, with a 5-year trough of $27.0 million in FY2020.
  • Moreover, its 3-year median value for Construction in Progress was $121.0 million (2024), whereas its average is $112.8 million.
  • In the last 5 years, AST SpaceMobile's Construction in Progress spiked by 150.31% in 2021 and then declined by 3.54% in 2024.
  • Over the past 5 years, AST SpaceMobile's Construction in Progress (Yearly) stood at $27.0 million in 2020, then skyrocketed by 150.31% to $67.6 million in 2021, then surged by 36.18% to $92.1 million in 2022, then skyrocketed by 36.22% to $125.4 million in 2023, then fell by 3.54% to $121.0 million in 2024.