AST SpaceMobile (ASTS) Construction in Progress (2020 - 2025)
Historic Construction in Progress for AST SpaceMobile (ASTS) over the last 6 years, with Q3 2025 value amounting to $754.8 million.
- AST SpaceMobile's Construction in Progress rose 30371.45% to $754.8 million in Q3 2025 from the same period last year, while for Sep 2025 it was $754.8 million, marking a year-over-year increase of 30371.45%. This contributed to the annual value of $121.0 million for FY2024, which is 354.31% down from last year.
- As of Q3 2025, AST SpaceMobile's Construction in Progress stood at $754.8 million, which was up 30371.45% from $523.9 million recorded in Q2 2025.
- In the past 5 years, AST SpaceMobile's Construction in Progress ranged from a high of $754.8 million in Q3 2025 and a low of $38.7 million during Q2 2021
- Its 5-year average for Construction in Progress is $166.7 million, with a median of $99.0 million in 2023.
- Its Construction in Progress has fluctuated over the past 5 years, first tumbled by 5328.58% in 2023, then skyrocketed by 30654.68% in 2024.
- Over the past 5 years, AST SpaceMobile's Construction in Progress (Quarter) stood at $67.6 million in 2021, then skyrocketed by 36.18% to $92.1 million in 2022, then skyrocketed by 36.22% to $125.4 million in 2023, then decreased by 3.54% to $121.0 million in 2024, then skyrocketed by 523.9% to $754.8 million in 2025.
- Its Construction in Progress was $754.8 million in Q3 2025, compared to $523.9 million in Q2 2025 and $226.0 million in Q1 2025.