AST SpaceMobile (ASTS) Construction in Progress: 2020-2025

Historic Construction in Progress for AST SpaceMobile (ASTS) over the last 5 years, with Sep 2025 value amounting to $754.8 million.

  • AST SpaceMobile's Construction in Progress rose 303.71% to $754.8 million in Q3 2025 from the same period last year, while for Sep 2025 it was $754.8 million, marking a year-over-year increase of 303.71%. This contributed to the annual value of $121.0 million for FY2024, which is 3.54% down from last year.
  • Latest data reveals that AST SpaceMobile reported Construction in Progress of $754.8 million as of Q3 2025, which was up 44.07% from $523.9 million recorded in Q2 2025.
  • Over the past 5 years, AST SpaceMobile's Construction in Progress peaked at $754.8 million during Q3 2025, and registered a low of $38.7 million during Q2 2021.
  • Over the past 3 years, AST SpaceMobile's median Construction in Progress value was $143.0 million (recorded in 2024), while the average stood at $225.8 million.
  • Per our database at Business Quant, AST SpaceMobile's Construction in Progress tumbled by 53.29% in 2023 and then surged by 306.55% in 2024.
  • Over the past 5 years, AST SpaceMobile's Construction in Progress (Quarterly) stood at $67.6 million in 2021, then surged by 36.18% to $92.1 million in 2022, then soared by 36.22% to $125.4 million in 2023, then dropped by 3.54% to $121.0 million in 2024, then spiked by 303.71% to $754.8 million in 2025.
  • Its Construction in Progress stands at $754.8 million for Q3 2025, versus $523.9 million for Q2 2025 and $226.0 million for Q1 2025.