AST SpaceMobile (ASTS) Construction in Progress (2020 - 2025)
Historic Construction in Progress for AST SpaceMobile (ASTS) over the last 6 years, with Q3 2025 value amounting to $754.8 million.
- AST SpaceMobile's Construction in Progress rose 30371.45% to $754.8 million in Q3 2025 from the same period last year, while for Sep 2025 it was $754.8 million, marking a year-over-year increase of 30371.45%. This contributed to the annual value of $121.0 million for FY2024, which is 354.31% down from last year.
- Latest data reveals that AST SpaceMobile reported Construction in Progress of $754.8 million as of Q3 2025, which was up 30371.45% from $523.9 million recorded in Q2 2025.
- Over the past 5 years, AST SpaceMobile's Construction in Progress peaked at $754.8 million during Q3 2025, and registered a low of $38.7 million during Q2 2021.
- Over the past 5 years, AST SpaceMobile's median Construction in Progress value was $99.0 million (recorded in 2023), while the average stood at $166.7 million.
- In the last 5 years, AST SpaceMobile's Construction in Progress crashed by 5328.58% in 2023 and then surged by 30654.68% in 2024.
- AST SpaceMobile's Construction in Progress (Quarter) stood at $67.6 million in 2021, then surged by 36.18% to $92.1 million in 2022, then surged by 36.22% to $125.4 million in 2023, then fell by 3.54% to $121.0 million in 2024, then surged by 523.9% to $754.8 million in 2025.
- Its last three reported values are $754.8 million in Q3 2025, $523.9 million for Q2 2025, and $226.0 million during Q1 2025.