AST SpaceMobile (ASTS) Construction in Progress (2020 - 2025)

AST SpaceMobile (ASTS) has disclosed Construction in Progress for 6 consecutive years, with $39.2 million as the latest value for Q4 2025.

  • On a quarterly basis, Construction in Progress fell 67.62% to $39.2 million in Q4 2025 year-over-year; TTM through Dec 2025 was $39.2 million, a 67.62% decrease, with the full-year FY2025 number at $39.2 million, down 67.62% from a year prior.
  • Construction in Progress was $39.2 million for Q4 2025 at AST SpaceMobile, down from $754.8 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $754.8 million in Q3 2025 to a low of $2.6 million in Q1 2024.
  • A 5-year average of $136.7 million and a median of $67.6 million in 2021 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: crashed 97.17% in 2024, then skyrocketed 15254.45% in 2025.
  • AST SpaceMobile's Construction in Progress stood at $67.6 million in 2021, then tumbled by 84.14% to $10.7 million in 2022, then plummeted by 50.97% to $5.3 million in 2023, then surged by 2201.83% to $121.0 million in 2024, then tumbled by 67.62% to $39.2 million in 2025.
  • Per Business Quant, the three most recent readings for ASTS's Construction in Progress are $39.2 million (Q4 2025), $754.8 million (Q3 2025), and $523.9 million (Q2 2025).