AST SpaceMobile (ASTS) Construction in Progress (2020 - 2026)

AST SpaceMobile has reported Construction in Progress over the past 7 years, most recently at $64.9 million for Q1 2026.

  • Quarterly Construction in Progress fell 71.29% to $64.9 million in Q1 2026 from the year-ago period, while the trailing twelve-month figure was $64.9 million through Mar 2026, down 71.29% year-over-year, with the annual reading at $1.1 billion for FY2025, 13372.95% up from the prior year.
  • Construction in Progress was $64.9 million for Q1 2026 at AST SpaceMobile, down from $1.1 billion in the prior quarter.
  • Over five years, Construction in Progress peaked at $1.1 billion in Q4 2025 and troughed at $2.6 million in Q1 2024.
  • The 5-year median for Construction in Progress is $53.6 million (2025), against an average of $125.7 million.
  • Year-over-year, Construction in Progress crashed 97.17% in 2024 and then soared 13372.95% in 2025.
  • A 5-year view of Construction in Progress shows it stood at $92.1 million in 2022, then surged by 36.22% to $125.4 million in 2023, then tumbled by 93.36% to $8.3 million in 2024, then soared by 13372.95% to $1.1 billion in 2025, then tumbled by 94.22% to $64.9 million in 2026.
  • Per Business Quant, the three most recent readings for ASTS's Construction in Progress are $64.9 million (Q1 2026), $1.1 billion (Q4 2025), and $42.4 million (Q3 2025).