AST SpaceMobile (ASTS) Construction in Progress (2020 - 2025)

AST SpaceMobile (ASTS) has disclosed Construction in Progress for 6 consecutive years, with $1.1 billion as the latest value for Q4 2025.

  • Quarterly Construction in Progress rose 827.42% to $1.1 billion in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $1.1 billion through Dec 2025, up 827.42% year-over-year, with the annual reading at $1.1 billion for FY2025, 827.42% up from the prior year.
  • Construction in Progress for Q4 2025 was $1.1 billion at AST SpaceMobile, up from $754.8 million in the prior quarter.
  • The five-year high for Construction in Progress was $1.1 billion in Q4 2025, with the low at $4.6 million in Q2 2024.
  • Average Construction in Progress over 5 years is $200.5 million, with a median of $92.3 million recorded in 2022.
  • The sharpest move saw Construction in Progress crashed 95.34% in 2024, then surged 15254.45% in 2025.
  • Over 5 years, Construction in Progress stood at $67.6 million in 2021, then crashed by 90.1% to $6.7 million in 2022, then surged by 1773.18% to $125.4 million in 2023, then dropped by 3.54% to $121.0 million in 2024, then skyrocketed by 827.42% to $1.1 billion in 2025.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $1.1 billion, $754.8 million, and $523.9 million for Q4 2025, Q3 2025, and Q2 2025 respectively.