Growth Metrics

ASP Isotopes (ASPI) Construction in Progress (2021 - 2023)

ASP Isotopes has reported Construction in Progress over the past 3 years, most recently at $8.0 million for Q1 2023.

  • For Q1 2023, Construction in Progress changed N/A year-over-year to $8.0 million; the TTM value through Mar 2023 reached $8.0 million, changed N/A, while the annual FY2022 figure was $8.2 million, 174.43% up from the prior year.
  • Construction in Progress for Q1 2023 was $8.0 million at ASP Isotopes, down from $8.2 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $8.2 million in Q4 2022 and troughed at $3.0 million in Q4 2021.
  • A 3-year average of $6.5 million and a median of $7.4 million in 2022 define the central range for Construction in Progress.
  • On a YoY basis, Construction in Progress climbed as much as 174.43% in 2022 and fell as far as 174.43% in 2022.
  • Year by year, Construction in Progress stood at $3.0 million in 2021, then soared by 174.43% to $8.2 million in 2022, then dropped by 2.38% to $8.0 million in 2023.
  • Business Quant data shows Construction in Progress for ASPI at $8.0 million in Q1 2023, $8.2 million in Q4 2022, and $6.9 million in Q3 2022.