Growth Metrics

ASP Isotopes (ASPI) Construction in Progress (2022 - 2023)

Historic Construction in Progress for ASP Isotopes (ASPI) over the last 2 years, with Q1 2023 value amounting to $8.0 million.

  • ASP Isotopes' Construction in Progress changed N/A to $8.0 million in Q1 2023 from the same period last year, while for Mar 2023 it was $8.0 million, marking a year-over-year change of. This contributed to the annual value of $8.2 million for FY2022, which is N/A changed from last year.
  • ASP Isotopes' Construction in Progress amounted to $8.0 million in Q1 2023.
  • Over the past 5 years, ASP Isotopes' Construction in Progress peaked at $8.2 million during Q4 2022, and registered a low of $6.9 million during Q3 2022.