Growth Metrics

Alpha & Omega Semiconductor (AOSL) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Alpha & Omega Semiconductor (AOSL) over the last 15 years, with Q4 2025 value amounting to $28.4 million.

  • Alpha & Omega Semiconductor's Construction in Progress rose 1843.45% to $28.4 million in Q4 2025 from the same period last year, while for Dec 2025 it was $28.4 million, marking a year-over-year increase of 1843.45%. This contributed to the annual value of $28.0 million for FY2025, which is 2127.69% up from last year.
  • Per Alpha & Omega Semiconductor's latest filing, its Construction in Progress stood at $28.4 million for Q4 2025, which was up 1843.45% from $26.3 million recorded in Q3 2025.
  • Over the past 5 years, Alpha & Omega Semiconductor's Construction in Progress peaked at $150.9 million during Q4 2022, and registered a low of $23.1 million during Q2 2024.
  • Moreover, its 5-year median value for Construction in Progress was $46.1 million (2021), whereas its average is $65.2 million.
  • Its Construction in Progress has fluctuated over the past 5 years, first soared by 24501.25% in 2022, then plummeted by 6946.82% in 2024.
  • Over the past 5 years, Alpha & Omega Semiconductor's Construction in Progress (Quarter) stood at $44.6 million in 2021, then soared by 238.47% to $150.9 million in 2022, then tumbled by 52.18% to $72.1 million in 2023, then crashed by 66.74% to $24.0 million in 2024, then grew by 18.43% to $28.4 million in 2025.
  • Its Construction in Progress was $28.4 million in Q4 2025, compared to $26.3 million in Q3 2025 and $28.0 million in Q2 2025.