Growth Metrics

Alpha & Omega Semiconductor (AOSL) Construction in Progress (2016 - 2025)

Alpha & Omega Semiconductor has reported Construction in Progress over the past 15 years, most recently at $28.4 million for Q4 2025.

  • Quarterly Construction in Progress rose 18.43% to $28.4 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $28.4 million through Dec 2025, up 18.43% year-over-year, with the annual reading at $28.0 million for FY2025, 21.28% up from the prior year.
  • Construction in Progress was $28.4 million for Q4 2025 at Alpha & Omega Semiconductor, up from $26.3 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $150.9 million in Q4 2022 and troughed at $23.1 million in Q2 2024.
  • The 5-year median for Construction in Progress is $46.1 million (2021), against an average of $65.2 million.
  • Year-over-year, Construction in Progress skyrocketed 245.01% in 2022 and then plummeted 69.47% in 2024.
  • A 5-year view of Construction in Progress shows it stood at $44.6 million in 2021, then surged by 238.47% to $150.9 million in 2022, then plummeted by 52.18% to $72.1 million in 2023, then plummeted by 66.74% to $24.0 million in 2024, then grew by 18.43% to $28.4 million in 2025.
  • Per Business Quant, the three most recent readings for AOSL's Construction in Progress are $28.4 million (Q4 2025), $26.3 million (Q3 2025), and $28.0 million (Q2 2025).