Ambarella (AMBA) Construction in Progress (2012 - 2013)

Ambarella (AMBA) reported Construction in Progress of $1.4 million for Q2 2013, up 65.66% on a QoQ basis from $827000.0 in Q1 2013.

Ambarella (AMBA) Construction in Progress (2012 - 2013) Analysis & Trends

Ambarella has reported Construction in Progress for 2 years, with the latest figure at $1.4 million in Q2 2013.

  • Construction in Progress for Q2 2013 came in at $1.4 million, changed N/A year-over-year; the trailing twelve-month figure through Apr 2013 was $1.4 million (changed N/A YoY), and the FY2013 annual result was $827000.0, changed N/A from the prior year.
  • Construction in Progress came in at $1.4 million for Q2 2013 at Ambarella, up from $827000.0 in the prior quarter.
  • The five-year high for Construction in Progress was $1.4 million in Q2 2013, with the low at $547000.0 in Q4 2012.

Peer Comparison

# Company Market Cap Enterprise Value Gross Profit (Qtr) Construction in Progress (Qtr)
1 Asml Holding 636.08 Bn 620.57 Bn 5.90 Bn 2.06 Bn
2 Applied Materials 406.04 Bn 399.30 Bn 3.95 Bn -
3 Lam Research 369.24 Bn 364.49 Bn 2.91 Bn -
4 Kla 240.65 Bn 238.86 Bn 2.09 Bn 220.76 Mn
5 Teradyne 58.07 Bn 57.82 Bn 780.95 Mn -
6 Qnity Electronics 27.70 Bn 26.85 Bn 618.00 Mn -
7 Entegris 18.25 Bn 17.80 Bn 380.80 Mn -
8 Onto Innovation 12.83 Bn 12.17 Bn 146.39 Mn -
9 Amkor Technology 12.41 Bn 9.90 Bn 318.59 Mn -
10 Ambarella 3.65 Bn 3.46 Bn 58.91 Mn -

Historic Data

Download Data
DateValue
Apr 30, 2013 1.37 Mn
Jan 31, 2013 827,000.00
Oct 31, 2012 547,000.00