Alexanders (ALX) Construction in Progress (2016 - 2025)
Alexanders' Construction in Progress history spans 16 years, with the latest figure at $2.2 million for Q4 2025.
- For Q4 2025, Construction in Progress fell 68.35% year-over-year to $2.2 million; the TTM value through Dec 2025 reached $2.2 million, down 68.35%, while the annual FY2025 figure was $2.2 million, 68.35% down from the prior year.
- Construction in Progress for Q4 2025 was $2.2 million at Alexanders, down from $4.9 million in the prior quarter.
- Across five years, Construction in Progress topped out at $22.6 million in Q1 2022 and bottomed at $281000.0 in Q4 2023.
- The 5-year median for Construction in Progress is $13.1 million (2021), against an average of $12.1 million.
- The largest annual shift saw Construction in Progress plummeted 98.73% in 2023 before it surged 2317.79% in 2024.
- A 5-year view of Construction in Progress shows it stood at $21.9 million in 2021, then grew by 0.88% to $22.0 million in 2022, then tumbled by 98.73% to $281000.0 in 2023, then soared by 2317.79% to $6.8 million in 2024, then crashed by 68.35% to $2.2 million in 2025.
- Per Business Quant, the three most recent readings for ALX's Construction in Progress are $2.2 million (Q4 2025), $4.9 million (Q3 2025), and $14.6 million (Q2 2025).