Growth Metrics

Alkermes (ALKS) Construction in Progress (2020 - 2024)

Alkermes (ALKS) has disclosed Construction in Progress for 4 consecutive years, with $30.6 million as the latest value for Q4 2024.

  • On a quarterly basis, Construction in Progress rose 955.17% to $30.6 million in Q4 2024 year-over-year; TTM through Dec 2024 was $30.6 million, a 955.17% increase, with the full-year FY2024 number at $30.6 million, up 955.17% from a year prior.
  • Construction in Progress was $30.6 million for Q4 2024 at Alkermes, up from $2.9 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $30.6 million in Q4 2024 to a low of $2.9 million in Q4 2023.
  • A 4-year average of $16.6 million and a median of $16.4 million in 2020 define the central range for Construction in Progress.
  • Biggest YoY gain for Construction in Progress was 955.17% in 2024; the steepest drop was 955.17% in 2024.
  • Alkermes' Construction in Progress stood at $24.2 million in 2020, then crashed by 64.05% to $8.7 million in 2022, then plummeted by 66.67% to $2.9 million in 2023, then soared by 955.17% to $30.6 million in 2024.
  • Per Business Quant, the three most recent readings for ALKS's Construction in Progress are $30.6 million (Q4 2024), $2.9 million (Q4 2023), and $8.7 million (Q3 2022).