Alkermes (ALKS) Construction in Progress (2020 - 2024)
Historic Construction in Progress for Alkermes (ALKS) over the last 4 years, with Q4 2024 value amounting to $30.6 million.
- Alkermes' Construction in Progress rose 95517.24% to $30.6 million in Q4 2024 from the same period last year, while for Dec 2024 it was $30.6 million, marking a year-over-year increase of 95517.24%. This contributed to the annual value of $30.6 million for FY2024, which is 95517.24% up from last year.
- Alkermes' Construction in Progress amounted to $30.6 million in Q4 2024, which was up 95517.24% from $2.9 million recorded in Q4 2023.
- Alkermes' Construction in Progress' 5-year high stood at $30.6 million during Q4 2024, with a 5-year trough of $2.9 million in Q4 2023.
- For the 4-year period, Alkermes' Construction in Progress averaged around $16.6 million, with its median value being $16.4 million (2020).
- Data for Alkermes' Construction in Progress shows a peak YoY increase of 95517.24% (in 2024) and a maximum YoY decrease of 95517.24% (in 2024) over the last 5 years.
- Alkermes' Construction in Progress (Quarter) stood at $24.2 million in 2020, then tumbled by 64.05% to $8.7 million in 2022, then plummeted by 66.67% to $2.9 million in 2023, then surged by 955.17% to $30.6 million in 2024.
- Its Construction in Progress was $30.6 million in Q4 2024, compared to $2.9 million in Q4 2023 and $8.7 million in Q3 2022.