Alkermes (ALKS) Construction in Progress (2020 - 2024)
Historic Construction in Progress for Alkermes (ALKS) over the last 4 years, with Q4 2024 value amounting to $30.6 million.
- Alkermes' Construction in Progress rose 95517.24% to $30.6 million in Q4 2024 from the same period last year, while for Dec 2024 it was $30.6 million, marking a year-over-year increase of 95517.24%. This contributed to the annual value of $30.6 million for FY2024, which is 95517.24% up from last year.
- Latest data reveals that Alkermes reported Construction in Progress of $30.6 million as of Q4 2024, which was up 95517.24% from $2.9 million recorded in Q4 2023.
- In the past 5 years, Alkermes' Construction in Progress ranged from a high of $30.6 million in Q4 2024 and a low of $2.9 million during Q4 2023
- Moreover, its 4-year median value for Construction in Progress was $16.4 million (2020), whereas its average is $16.6 million.
- Examining YoY changes over the last 5 years, Alkermes' Construction in Progress showed a top increase of 95517.24% in 2024 and a maximum decrease of 95517.24% in 2024.
- Alkermes' Construction in Progress (Quarter) stood at $24.2 million in 2020, then crashed by 64.05% to $8.7 million in 2022, then tumbled by 66.67% to $2.9 million in 2023, then soared by 955.17% to $30.6 million in 2024.
- Its Construction in Progress stands at $30.6 million for Q4 2024, versus $2.9 million for Q4 2023 and $8.7 million for Q3 2022.