Alkermes (ALKS) Construction in Progress (2020 - 2024)
Alkermes has reported Construction in Progress over the past 4 years, most recently at $30.6 million for Q4 2024.
- Quarterly Construction in Progress rose 955.17% to $30.6 million in Q4 2024 from the year-ago period, while the trailing twelve-month figure was $30.6 million through Dec 2024, up 955.17% year-over-year, with the annual reading at $30.6 million for FY2024, 955.17% up from the prior year.
- Construction in Progress was $30.6 million for Q4 2024 at Alkermes, up from $2.9 million in the prior quarter.
- Over five years, Construction in Progress peaked at $30.6 million in Q4 2024 and troughed at $2.9 million in Q4 2023.
- The 4-year median for Construction in Progress is $16.4 million (2020), against an average of $16.6 million.
- The largest YoY upside for Construction in Progress was 955.17% in 2024 against a maximum downside of 955.17% in 2024.
- A 4-year view of Construction in Progress shows it stood at $24.2 million in 2020, then tumbled by 64.05% to $8.7 million in 2022, then crashed by 66.67% to $2.9 million in 2023, then surged by 955.17% to $30.6 million in 2024.
- Per Business Quant, the three most recent readings for ALKS's Construction in Progress are $30.6 million (Q4 2024), $2.9 million (Q4 2023), and $8.7 million (Q3 2022).