Growth Metrics

Alkermes (ALKS) Construction in Progress (2020 - 2024)

Alkermes (ALKS) has disclosed Construction in Progress for 4 consecutive years, with $30.6 million as the latest value for Q4 2024.

  • Quarterly Construction in Progress rose 955.17% to $30.6 million in Q4 2024 from the year-ago period, while the trailing twelve-month figure was $30.6 million through Dec 2024, up 955.17% year-over-year, with the annual reading at $30.6 million for FY2024, 955.17% up from the prior year.
  • Construction in Progress for Q4 2024 was $30.6 million at Alkermes, up from $2.9 million in the prior quarter.
  • The five-year high for Construction in Progress was $30.6 million in Q4 2024, with the low at $2.9 million in Q4 2023.
  • Average Construction in Progress over 4 years is $16.6 million, with a median of $16.4 million recorded in 2020.
  • Peak annual rise in Construction in Progress hit 955.17% in 2024, while the deepest fall reached 955.17% in 2024.
  • Over 4 years, Construction in Progress stood at $24.2 million in 2020, then plummeted by 64.05% to $8.7 million in 2022, then tumbled by 66.67% to $2.9 million in 2023, then skyrocketed by 955.17% to $30.6 million in 2024.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $30.6 million, $2.9 million, and $8.7 million for Q4 2024, Q4 2023, and Q3 2022 respectively.