Astera Labs (ALAB) Construction in Progress (2025)

Astera Labs' (ALAB) quarterly Construction in Progress came in at $13.5 million in Q4 2025.

Astera Labs (ALAB) Construction in Progress (2025) Analysis & Trends

Astera Labs (ALAB) has 1 years of Construction in Progress data on file, last reported at $13.5 million in Q4 2025.

  • Quarterly Construction in Progress changed N/A year-over-year to $13.5 million in Q4 2025, while the trailing twelve-month figure through Dec 2025 was $13.5 million (changed N/A YoY) and the FY2025 annual result came in at $13.5 million, changed N/A from the prior year.
  • Construction in Progress was little changed at $13.5 million in Q4 2025.
  • In the past five years, Construction in Progress ranged from a high of $13.5 million in Q4 2025 to a low of $13.5 million in Q4 2025.

Peer Comparison

# Company Market Cap Enterprise Value Gross Profit (Qtr) Construction in Progress (Qtr)
1 Nvidia 5,000.69 Bn 4,957.21 Bn 61.16 Bn -
2 Taiwan Semiconductor Manufacturing 2,106.48 Bn 2,009.53 Bn 23.77 Bn -
3 Broadcom 1,866.23 Bn 1,846.60 Bn 15.42 Bn -
4 Micron Technology 1,057.61 Bn 1,031.59 Bn 35.06 Bn -
5 Advanced Micro Devices 822.43 Bn 810.09 Bn 5.42 Bn 646.00 Mn
6 Intel 458.91 Bn 444.79 Bn 6.51 Bn -
7 Aeluma 301.08 Bn 301.05 Bn 386,000.00 -
8 Arm Holdings 255.32 Bn 251.43 Bn 1.25 Bn -
9 Texas Instruments 245.36 Bn 238.36 Bn 3.35 Bn -
10 Astera Labs 54.99 Bn 53.80 Bn 235.14 Mn -

Historic Data

Download Data
DateValue
Dec 31, 2025 13.50 Mn