KPIs & Operating Metrics(New)

Acadia Realty Trust (AKR) Construction in Progress (2016 - 2025)

Acadia Realty Trust (AKR) has disclosed Construction in Progress for 15 consecutive years, with $167.1 million as the latest value for Q4 2025.

  • On a quarterly basis, Construction in Progress rose 28.88% to $167.1 million in Q4 2025 year-over-year; TTM through Dec 2025 was $167.1 million, a 28.88% increase, with the full-year FY2025 number at $167.1 million, up 28.88% from a year prior.
  • Construction in Progress was $167.1 million for Q4 2025 at Acadia Realty Trust, up from $142.5 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $203.0 million in Q2 2022 to a low of $92.7 million in Q3 2023.
  • A 4-year average of $139.8 million and a median of $135.9 million in 2024 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: tumbled 50.24% in 2023, then surged 50.48% in 2025.
  • Acadia Realty Trust's Construction in Progress stood at $184.6 million in 2022, then tumbled by 48.65% to $94.8 million in 2023, then surged by 36.73% to $129.6 million in 2024, then increased by 28.88% to $167.1 million in 2025.
  • Per Business Quant, the three most recent readings for AKR's Construction in Progress are $167.1 million (Q4 2025), $142.5 million (Q3 2025), and $153.2 million (Q2 2025).