Ashford Hospitality Trust Inc (AHT) Construction in Progress (2011 - 2018)
Ashford Hospitality Trust (AHT) posted Construction in Progress of $37.4 million for Q4 2018, up 6.01% on a QoQ basis from $35.3 million in Q4 2017, and up 6.01% year-over-year from $35.3 million in Q4 2017.
Analysis
Ashford Hospitality Trust Inc (AHT) Construction in Progress (2011 - 2018) Analysis & Trends
Ashford Hospitality Trust has reported Construction in Progress for 7 years, with the latest figure at $37.4 million in Q4 2018.
- On a quarterly basis, Construction in Progress rose 6.01% year-over-year to $37.4 million in Q4 2018; TTM through Dec 2018 was $37.4 million, a 6.01% increase from a year earlier, with the FY2018 full-year figure at $37.4 million, up 6.01% from the prior year.
- Construction in Progress was $37.4 million for Q4 2018 at Ashford Hospitality Trust, up from $35.3 million in the prior quarter.
- The five-year high for Construction in Progress was $37.4 million in Q4 2018, with the low at $11.7 million in Q4 2014.
- Average Construction in Progress over 5 years is $29.6 million, with a median of $32.5 million recorded in 2016.
- The sharpest annual moves came in 2015 and 2016: Construction in Progress soared 166.87% in 2015, then grew 4.13% in 2016.
- Over 5 years, Construction in Progress stood at $11.7 million in 2014, then jumped by 166.87% to $31.2 million in 2015, then grew by 4.13% to $32.5 million in 2016, then gained by 8.45% to $35.3 million in 2017, then advanced by 6.01% to $37.4 million in 2018.
- The last three Construction in Progress figures came in at $37.4 million (Q4 2018), $35.3 million (Q4 2017), and $32.5 million (Q4 2016), per Business Quant data.
Peer Set
Peer Comparison
Historic Data
Download Data
Historic Data
| Date | Value |
|---|---|
| Dec 31, 2018 | 37.39 Mn |
| Dec 31, 2017 | 35.27 Mn |
| Dec 31, 2016 | 32.53 Mn |
| Dec 31, 2015 | 31.24 Mn |
| Dec 31, 2014 | 11.70 Mn |
| Dec 31, 2012 | 10.50 Mn |
| Dec 31, 2011 | 5.84 Mn |