Growth Metrics

Alset (AEI) Construction in Progress (2019 - 2024)

Alset (AEI) has disclosed Construction in Progress for 6 consecutive years, with $5.5 million as the latest value for Q3 2024.

  • On a quarterly basis, Construction in Progress rose 1.32% to $5.5 million in Q3 2024 year-over-year; TTM through Sep 2024 was $5.5 million, a 1.32% increase, with the full-year FY2023 number at $7.0 million, down 54.96% from a year prior.
  • Construction in Progress was $5.5 million for Q3 2024 at Alset, down from $7.2 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $18.0 million in Q1 2023 to a low of $4.7 million in Q2 2023.
  • A 5-year average of $8.9 million and a median of $7.4 million in 2021 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: skyrocketed 145.76% in 2023, then tumbled 66.35% in 2024.
  • Alset's Construction in Progress stood at $9.6 million in 2020, then fell by 10.15% to $8.6 million in 2021, then soared by 80.37% to $15.5 million in 2022, then crashed by 54.96% to $7.0 million in 2023, then fell by 21.95% to $5.5 million in 2024.
  • Per Business Quant, the three most recent readings for AEI's Construction in Progress are $5.5 million (Q3 2024), $7.2 million (Q2 2024), and $6.1 million (Q1 2024).