Growth Metrics

Aehr Test Systems (AEHR) Construction in Progress (2024 - 2026)

Aehr Test Systems filings provide 3 years of Construction in Progress readings, the most recent being $1.5 million for Q1 2026.

  • On a quarterly basis, Construction in Progress fell 64.33% to $1.5 million in Q1 2026 year-over-year; TTM through Feb 2026 was $1.5 million, a 64.33% decrease, with the full-year FY2025 number at $362000.0, down 43.26% from a year prior.
  • Construction in Progress hit $1.5 million in Q1 2026 for Aehr Test Systems, up from $888000.0 in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $4.2 million in Q1 2025 to a low of $362000.0 in Q2 2025.
  • Median Construction in Progress over the past 3 years was $780500.0 (2025), compared with a mean of $1.4 million.
  • Biggest five-year swings in Construction in Progress: crashed 43.26% in 2025 and later tumbled 64.33% in 2026.
  • Aehr Test Systems' Construction in Progress stood at $638000.0 in 2024, then soared by 39.18% to $888000.0 in 2025, then skyrocketed by 66.89% to $1.5 million in 2026.
  • The last three reported values for Construction in Progress were $1.5 million (Q1 2026), $888000.0 (Q4 2025), and $673000.0 (Q3 2025) per Business Quant data.