Growth Metrics

Aehr Test Systems (AEHR) Construction in Progress (2024 - 2025)

Historic Construction in Progress for Aehr Test Systems (AEHR) over the last 2 years, with Q4 2025 value amounting to $888000.0.

  • Aehr Test Systems' Construction in Progress changed N/A to $888000.0 in Q4 2025 from the same period last year, while for Nov 2025 it was $888000.0, marking a year-over-year change of. This contributed to the annual value of $362000.0 for FY2025, which is 4326.02% down from last year.
  • As of Q4 2025, Aehr Test Systems' Construction in Progress stood at $888000.0.
  • In the past 5 years, Aehr Test Systems' Construction in Progress ranged from a high of $4.2 million in Q1 2025 and a low of $362000.0 during Q2 2025