Growth Metrics

Aehr Test Systems (AEHR) Construction in Progress (2024 - 2026)

Aehr Test Systems' Construction in Progress history spans 3 years, with the latest figure at $1.5 million for Q1 2026.

  • For Q1 2026, Construction in Progress fell 64.33% year-over-year to $1.5 million; the TTM value through Feb 2026 reached $1.5 million, down 64.33%, while the annual FY2025 figure was $362000.0, 43.26% down from the prior year.
  • Construction in Progress reached $1.5 million in Q1 2026 per AEHR's latest filing, up from $888000.0 in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $4.2 million in Q1 2025 to a low of $362000.0 in Q2 2025.
  • Average Construction in Progress over 3 years is $1.4 million, with a median of $780500.0 recorded in 2025.
  • Peak YoY movement for Construction in Progress: tumbled 43.26% in 2025, then plummeted 64.33% in 2026.
  • A 3-year view of Construction in Progress shows it stood at $638000.0 in 2024, then soared by 39.18% to $888000.0 in 2025, then skyrocketed by 66.89% to $1.5 million in 2026.
  • Per Business Quant, the three most recent readings for AEHR's Construction in Progress are $1.5 million (Q1 2026), $888000.0 (Q4 2025), and $673000.0 (Q3 2025).