Growth Metrics

ACM Research (ACMR) Construction in Progress (2016 - 2025)

ACM Research has reported Construction in Progress over the past 9 years, most recently at $28.4 million for Q4 2025.

  • Quarterly Construction in Progress fell 71.0% to $28.4 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $28.4 million through Dec 2025, down 71.0% year-over-year, with the annual reading at $28.4 million for FY2025, 71.0% down from the prior year.
  • Construction in Progress was $28.4 million for Q4 2025 at ACM Research, down from $43.3 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $150.2 million in Q3 2024 and troughed at $2.9 million in Q1 2021.
  • The 5-year median for Construction in Progress is $40.2 million (2025), against an average of $56.1 million.
  • Year-over-year, Construction in Progress surged 722.18% in 2023 and then tumbled 72.81% in 2025.
  • A 5-year view of Construction in Progress shows it stood at $5.6 million in 2021, then soared by 550.89% to $36.5 million in 2022, then skyrocketed by 191.7% to $106.4 million in 2023, then fell by 8.01% to $97.9 million in 2024, then plummeted by 71.0% to $28.4 million in 2025.
  • Per Business Quant, the three most recent readings for ACMR's Construction in Progress are $28.4 million (Q4 2025), $43.3 million (Q3 2025), and $37.1 million (Q2 2025).