Fortis FTS

NYSE FTS
$58.93 -0.48 (-0.81%)
At close: Nov 27, 2026 · 4:00 PM EST
Key Stats
Market Cap29.90 Bn
Enterprise Value53.00 Bn
Revenue (Yr)8.71 Bn
P/E22.95
P/FCF-56.96
EV to EBIT20.63
Net Income (Yr)1.40 Bn
FCF (Yr)-1.35 Bn
EPS (Diluted) (TTM)2.57
Revenue Growth (1y) (Yr)3.63%
Net Margin (Yr)14.08%
ROA (Yr)2.65%
Add ratio to table…

About

Fortis Inc. is a diversified North American regulated electric and gas utility holding company. The corporation focuses on energy delivery with approximately 95% of its assets related to transmission and distribution operations. Fortis Inc. serves 3.5 million utility customers across five Canadian provinces, ten U. S. states, and the Caribbean. The business model emphasizes stable, predictable earnings and cash flows derived from regulated utility activities. Fortis Inc.…

Read more ↓
Sector: Utilities Sector rationale Fortis Inc. is a regulated electric and gas utility holding company that generates revenue through the transmission and distribution of electricity and natural gas. Its business model is based on regulated rates approved by authorities to recover costs and earn a return on rate base assets, which is the defining characteristic of the Utilities sector. Industries: Regulated Electric Utilities Regulated Electric Utilities Primary Fortis is a diversified regulated electric utility holding company serving 3.5 million customers through subsidiaries like FortisAlberta, FortisBC Electric, and Newfoundland Power. It earns a regulated return on rate-base assets for delivering electricity to residential, commercial, and industrial users. Regulated Gas Utilities Regulated Gas Utilities Secondary The company operates regulated natural gas distribution networks through subsidiaries such as FortisBC Energy, the largest regulated distributor of natural gas in British Columbia, and UNS Gas Inc. Electric Transmission Electric Transmission Secondary Fortis owns and operates high-voltage electric transmission infrastructure through ITC, which functions as an independent transmission provider regulated by FERC across multiple U.S. states. Classified using BQ-MICS CIK: 0001666175
Bull & bear

Investment Thesis

▲ Bull case
  • ITC Transmission Growth Engine

    ITC's capital plan has expanded to $11.6 billion, the largest in its history, driving a 5-year rate base CAGR of 8.6% that now represents the single largest contributor to Fortis's consolidated 7.5% growth rate. The MISO Tranche 2.1 long-range transmission plan and the newly awarded Mark project in Iowa, a competitive bid for 300 miles of 345 and 765 kV lines with a US$1 billion total investment, provide visible, contracted growth through 2031. Beyond the base plan, a pipeline of US$2.9-3.4 billion in rights-of-first-refusal projects and over 10 GW of active data center and industrial interconnection requests, up from 8 GW last quarter, creates a high-probability runway for capital deployment that requires no M&A execution risk to materialize.

  • FortisBC LNG Infrastructure Optionality

    FortisBC's capital plan jumped to $6 billion, lifting its rate base CAGR to 7.9% from 6%, anchored by the Tilbury Phase 1B liquefaction expansion and a new 3 Bcf LNG storage tank with environmental approvals already secured. The Phase 1B project, supported by an Order in Council, targets the marine bunkering fuel market with approximately $1.7 billion in investment, while the Phase 2 expansion holds a staged option for up to 2.5 million tonnes per annum of additional liquefaction capacity representing a $2-4 billion opportunity. Critically, the storage tank investment improves system resiliency and gas supply cost management for existing ratepayers, creating a regulatory asset base that earns regardless of whether export liquefaction volumes fully materialize on the original timeline.

  • UNS Energy Load Growth Visibility

    UNS Energy's $5.6 billion plan supports 7.4% rate base growth, but the embedded optionality in Arizona is distinct because the first 300 MW data center energy supply agreement is already approved and ramping in 2027 using existing and planned resources, delivering an immediate $13 per month customer bill reduction that validates the "no cost shifting" regulatory framework. The Integrated Resource Plan filed last week outlines a base case of 5.7% annual sales growth through 2031 and a high-growth scenario requiring 800 MW of new generation and up to $1.5 billion of incremental investment not yet in the capital plan. With mining, industrial electrification, and a second data center site of 500-700 MW in negotiation, the utility has multiple identifiable demand drivers that convert directly into generation, transmission, and distribution rate base without relying on speculative export markets.

  • Disciplined Funding With Credit Metric Buffer

    The $3.4 billion increase in the 5-year capital plan and $400 million increase in 2026 spending are being funded without degrading credit quality, as evidenced by the pre-funding of US$1 billion in hybrids and $260 million in ATM equity during Q3 alone. Management targets a 50-75 bps buffer above rating agency thresholds, with projected average S&P FFO-to-debt above 12% and Fitch FFO leverage near 5.9x over the plan period. The funding mix remains heavily weighted to operating cash flow and utility-level debt, with the DRIP as the primary equity source and only $250 million of ATM equity flagged for the next 12 months, leaving hybrid capacity of over $2.5 billion available if incremental projects crystallize without pressuring the dividend growth corridor.

  • Dividend Growth Extended Through 2031

    The Board declared a 4% dividend increase marking 53 consecutive years of increases, and management extended the 4-6% annual dividend growth guidance through 2031, aligning the payout trajectory with the 7.5% rate base CAGR and the visible capital plan. The payout ratio has been nudged lower over the past three to four years, creating room for dividend growth to potentially track toward the upper half of the guidance range as the larger rate base generates earnings. Because the capital plan is 100% regulated and 75% directed to transmission and distribution, the earnings underpinning the dividend are insulated from commodity price volatility and merchant generation risk that affect peers with unregulated exposure.

▼ Bear case
  • TEP Rate Case Regulatory Lag

    Tucson Electric Power's rate case outcome carries a structural lag: the ALJ recommended an annual formulaic adjustment mechanism with a plus-or-minus 50 bps band around a 9.65% allowed ROE, but the first adjustment does not take effect until April 2028. Rates implemented December 1, 2026 will reflect a historical test year, leaving 16 months of rate base growth and inflation uncovered by the automatic adjuster. Management acknowledged this gap explicitly and noted they are still evaluating whether to revisit EPS guidance, meaning the 7.4% rate base CAGR at UNS Energy may not translate linearly into earnings per share during the transition period, particularly if operating costs or interest expense exceed the test year assumptions baked into the initial rates.

  • FortisBC Phase 2 Permitting and Offtake Uncertainty

    While the Tilbury Phase 2 environmental assessment certificate was received, the project still requires a final investment decision, upstream gas supply arrangements, and long-term offtake agreements for either expanded marine bunkering or export LNG. Management stated the $2-4 billion opportunity is mostly beyond 2031 and development is staged, but the export pathway depends on federal and provincial policy alignment, Indigenous consultation, and global LNG pricing dynamics that are outside FortisBC's control. If offtake commitments do not materialize at prices that support the regulatory model, the liquefaction capacity could remain unbuilt while the storage tank - already in the plan - earns a regulated return on a smaller asset base than the full Phase 2 vision implies.

  • ITC Data Center Pipeline Conversion Risk

    The 10 GW of data center and industrial interconnection requests at ITC represents a pipeline, not contracted load, and management emphasized they never put projects in the capital plan until they are real. Only $800 million for publicly announced and approved data centers is currently in the $11.6 billion plan. The remaining 9+ GW spans early planning to active negotiation, and recent industry commentary has highlighted slippage in data center timelines due to power availability, permitting, and customer re-scoping. If conversion rates fall below historical utility interconnection averages, the post-2031 Tranche 2.1 rights-of-first-refusal projects worth US$2.9-3.4 billion could face deferral, reducing the visible growth runway that currently supports the 8.6% CAGR assumption.

  • Alberta PBR Appeal Dismissal Limits Upside

    FortisAlberta's third Performance-Based Regulation term appeal was dismissed by the court, aligning with the prior AUC decision and effectively closing the legal path to challenge the current framework's capital funding mechanism. While management describes the regulator relationship as constructive and notes proactive discussions on rebasing and future rate-making approaches, the dismissal removes a potential catalyst for a more favorable capital tracker or return to cost-of-service regulation that could have accelerated earnings growth. The utility operates in 8 of Alberta's 10 fastest-growing communities, but under the existing PBR framework, the incentive mechanism caps the upside from that load growth until the next rebasing or framework review, the timing and outcome of which remain uncertain.

  • Hybrid and ATM Reliance for Incremental Growth

    Funding for projects above the current $32.2 billion plan relies on expanding hybrid issuance toward the 10% DBRS limit (implying over $2.5 billion of additional capacity) and deploying the ATM program beyond the $250 million flagged for the next 12 months. Management explicitly stated they have no plans to use the ATM above current guidance unless incremental capital is added, and hybrid capacity, while available, increases the fixed charge burden and is treated as 50% equity/50% debt by rating agencies. If multiple large projects - Tilbury Phase 2, ITC data center build-out, UNS high-growth scenario - crystallize simultaneously, the combined equity requirement could pressure the 4-6% dividend growth guidance or force a larger-than-signaled ATM program, diluting existing shareholders at a time when the stock may not reflect the full NPV of the new assets.

Segments Breakdown of Revenue (2025)

History

Public Utility Regulated Or Unregulated Status Breakdown of Revenue (2025)

History
Peer percentiles

How Fortis ranks

Ranked against the 67 companies in Regulated Utilities58 metrics · as of Nov 28, 2026

Valuation

12 metrics · Lower multiples rank higher; a negative multiple ranks last
  • P/E 23.0xMedian 20.3x 26th
  • P/FCFNegative free cash flow −57.0xMedian 25.7x 72nd
  • P/Operating cash flow 8.72xMedian 10.1x 72nd
  • P/S 3.31xMedian 2.80x 34th
  • P/B 1.51xMedian 1.75x 72nd
  • P/Tangible book 1.61xMedian 1.78x 65th
  • EV/EBITDA 12.6xMedian 12.9x 54th
  • EV/EBIT 20.3xMedian 21.0x 59th
  • EV/Revenue 5.78xMedian 4.95x 31st
  • EV/FCFNegative free cash flow −99.5xMedian 49.1x 75th
  • EV/Operating cash flow 15.2xMedian 16.7x 65th
  • PEG (3Y EPS CAGR) 6.54Median 2.12 6th
Peer group

Peer Comparison

Companies in the Regulated Electric Utilities
View all peers
S.No. Ticker Company Market CapP/EP/STotal Debt (Qtr)
1 NEE Nextera Energy Inc 178.14 Bn15.256.18110.22 Bn
2 SO Southern Co 110.65 Bn22.033.5574.00 Bn
3 DUK Duke Energy CORP 102.89 Bn19.293.0492.79 Bn
4 AEP American Electric Power Co Inc 69.52 Bn29.512.9454.42 Bn
5 D Dominion Energy, Inc 59.79 Bn22.233.1162.11 Bn
6 XEL Xcel Energy Inc 51.74 Bn19.203.4840.60 Bn
7 SRE Sempra 51.69 Bn16.893.8037.47 Bn
8 FTS Fortis Inc. 29.90 Bn22.953.3123.67 Bn