Zhongchao (ZCMD) Construction in Progress (2018 - 2019)
Zhongchao has reported Construction in Progress over the past 2 years, most recently at $1.6 million for Q4 2019.
- Quarterly Construction in Progress rose 215.6% to $1.6 million in Q4 2019 from the year-ago period, while the trailing twelve-month figure was $1.6 million through Dec 2019, up 215.6% year-over-year, with the annual reading at $1.6 million for FY2019, 215.6% up from the prior year.
- Construction in Progress was $1.6 million for Q4 2019 at Zhongchao, up from $502448.0 in the prior quarter.
- Over five years, Construction in Progress peaked at $1.6 million in Q4 2019 and troughed at $502448.0 in Q4 2018.