Growth Metrics

Yunhong Green Cti (YHGJ) Construction in Progress (2016 - 2026)

Yunhong Green Cti filings provide 16 years of Construction in Progress readings, the most recent being $140000.0 for Q4 2025.

  • On a quarterly basis, Construction in Progress fell 28.57% to $140000.0 in Q4 2025 year-over-year; TTM through Dec 2025 was $140000.0, a 28.57% decrease, with the full-year FY2025 number at $140000.0, down 28.57% from a year prior.
  • Construction in Progress hit $140000.0 in Q4 2025 for Yunhong Green Cti, up from $125000.0 in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $318000.0 in Q2 2024 to a low of $41000.0 in Q3 2023.
  • Median Construction in Progress over the past 5 years was $158500.0 (2022), compared with a mean of $166381.0.
  • Biggest five-year swings in Construction in Progress: crashed 73.2% in 2023 and later surged 304.88% in 2024.
  • Yunhong Green Cti's Construction in Progress stood at $223000.0 in 2021, then crashed by 51.57% to $108000.0 in 2022, then grew by 3.7% to $112000.0 in 2023, then soared by 75.0% to $196000.0 in 2024, then fell by 28.57% to $140000.0 in 2025.
  • The last three reported values for Construction in Progress were $140000.0 (Q4 2025), $125000.0 (Q3 2025), and $238000.0 (Q2 2025) per Business Quant data.