Growth Metrics

Yunhong Green Cti (YHGJ) Construction in Progress (2016 - 2025)

Yunhong Green Cti's Construction in Progress history spans 16 years, with the latest figure at $140000.0 for Q4 2025.

  • For Q4 2025, Construction in Progress fell 28.57% year-over-year to $140000.0; the TTM value through Dec 2025 reached $140000.0, down 28.57%, while the annual FY2025 figure was $140000.0, 28.57% down from the prior year.
  • Construction in Progress reached $140000.0 in Q4 2025 per YHGJ's latest filing, up from $125000.0 in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $318000.0 in Q2 2024 to a low of $41000.0 in Q3 2023.
  • Average Construction in Progress over 5 years is $166381.0, with a median of $158500.0 recorded in 2022.
  • Peak YoY movement for Construction in Progress: tumbled 73.2% in 2023, then skyrocketed 304.88% in 2024.
  • A 5-year view of Construction in Progress shows it stood at $223000.0 in 2021, then crashed by 51.57% to $108000.0 in 2022, then grew by 3.7% to $112000.0 in 2023, then soared by 75.0% to $196000.0 in 2024, then fell by 28.57% to $140000.0 in 2025.
  • Per Business Quant, the three most recent readings for YHGJ's Construction in Progress are $140000.0 (Q4 2025), $125000.0 (Q3 2025), and $238000.0 (Q2 2025).