Woodward (WWD) Construction in Progress (2016 - 2019)
Historic Construction in Progress for Woodward (WWD) over the last 11 years, with Q3 2019 value amounting to $21.2 million.
- Woodward's Construction in Progress fell 3427.5% to $21.2 million in Q3 2019 from the same period last year, while for Sep 2019 it was $21.2 million, marking a year-over-year decrease of 3427.5%. This contributed to the annual value of $21.2 million for FY2019, which is 3427.5% down from last year.
- Woodward's Construction in Progress amounted to $21.2 million in Q3 2019, which was down 3427.5% from $23.8 million recorded in Q2 2019.
- In the past 5 years, Woodward's Construction in Progress ranged from a high of $279.4 million in Q4 2015 and a low of $21.2 million during Q3 2019
- Its 5-year average for Construction in Progress is $107.4 million, with a median of $88.9 million in 2016.
- Per our database at Business Quant, Woodward's Construction in Progress skyrocketed by 12134.45% in 2015 and then plummeted by 6823.74% in 2018.
- Over the past 5 years, Woodward's Construction in Progress (Quarter) stood at $279.4 million in 2015, then tumbled by 66.89% to $92.5 million in 2016, then tumbled by 47.07% to $49.0 million in 2017, then crashed by 37.54% to $30.6 million in 2018, then crashed by 30.7% to $21.2 million in 2019.
- Its Construction in Progress was $21.2 million in Q3 2019, compared to $23.8 million in Q2 2019 and $27.7 million in Q1 2019.