Growth Metrics

Woodward (WWD) Construction in Progress (2016 - 2019)

Woodward (WWD) has disclosed Construction in Progress for 10 consecutive years, with $21.2 million as the latest value for Q3 2019.

  • For Q3 2019, Construction in Progress rose 434.28% year-over-year to $21.2 million; the TTM value through Sep 2019 reached $21.2 million, up 434.28%, while the annual FY2019 figure was $21.2 million, 434.28% up from the prior year.
  • Construction in Progress hit $21.2 million in Q3 2019 for Woodward, down from $23.8 million in the prior quarter.
  • Across five years, Construction in Progress topped out at $279.4 million in Q4 2015 and bottomed at $4.0 million in Q3 2018.
  • Average Construction in Progress over 5 years is $104.9 million, with a median of $88.9 million recorded in 2016.
  • Year-over-year, Construction in Progress tumbled 91.96% in 2018 and then surged 434.28% in 2019.
  • Woodward's Construction in Progress stood at $279.4 million in 2015, then crashed by 66.89% to $92.5 million in 2016, then plummeted by 47.07% to $49.0 million in 2017, then tumbled by 37.54% to $30.6 million in 2018, then crashed by 30.7% to $21.2 million in 2019.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $21.2 million, $23.8 million, and $9.9 million for Q3 2019, Q2 2019, and Q1 2019 respectively.