Woodward (WWD) Construction in Progress (2016 - 2019)
Historic Construction in Progress for Woodward (WWD) over the last 11 years, with Q3 2019 value amounting to $21.2 million.
- Woodward's Construction in Progress fell 3427.5% to $21.2 million in Q3 2019 from the same period last year, while for Sep 2019 it was $21.2 million, marking a year-over-year decrease of 3427.5%. This contributed to the annual value of $21.2 million for FY2019, which is 3427.5% down from last year.
- Per Woodward's latest filing, its Construction in Progress stood at $21.2 million for Q3 2019, which was down 3427.5% from $23.8 million recorded in Q2 2019.
- In the past 5 years, Woodward's Construction in Progress registered a high of $279.4 million during Q4 2015, and its lowest value of $21.2 million during Q3 2019.
- For the 5-year period, Woodward's Construction in Progress averaged around $107.4 million, with its median value being $88.9 million (2016).
- Per our database at Business Quant, Woodward's Construction in Progress surged by 12134.45% in 2015 and then tumbled by 6823.74% in 2018.
- Woodward's Construction in Progress (Quarter) stood at $279.4 million in 2015, then crashed by 66.89% to $92.5 million in 2016, then crashed by 47.07% to $49.0 million in 2017, then plummeted by 37.54% to $30.6 million in 2018, then plummeted by 30.7% to $21.2 million in 2019.
- Its last three reported values are $21.2 million in Q3 2019, $23.8 million for Q2 2019, and $27.7 million during Q1 2019.