Howmet Aerospace (HWM) Construction in Progress (2016 - 2022)
Historic Construction in Progress for Howmet Aerospace (HWM) over the last 13 years, with Q4 2022 value amounting to $179.0 million.
- Howmet Aerospace's Construction in Progress fell 164.84% to $179.0 million in Q4 2022 from the same period last year, while for Dec 2022 it was $179.0 million, marking a year-over-year decrease of 164.84%. This contributed to the annual value of $179.0 million for FY2022, which is 164.84% down from last year.
- According to the latest figures from Q4 2022, Howmet Aerospace's Construction in Progress is $179.0 million, which was down 164.84% from $182.0 million recorded in Q4 2021.
- In the past 5 years, Howmet Aerospace's Construction in Progress registered a high of $767.0 million during Q2 2019, and its lowest value of $179.0 million during Q4 2022.
- Moreover, its 5-year median value for Construction in Progress was $415.0 million (2019), whereas its average is $461.6 million.
- Per our database at Business Quant, Howmet Aerospace's Construction in Progress tumbled by 4987.95% in 2020 and then plummeted by 164.84% in 2022.
- Quarter analysis of 5 years shows Howmet Aerospace's Construction in Progress stood at $739.0 million in 2018, then plummeted by 43.84% to $415.0 million in 2019, then crashed by 49.88% to $208.0 million in 2020, then fell by 12.5% to $182.0 million in 2021, then dropped by 1.65% to $179.0 million in 2022.
- Its Construction in Progress was $179.0 million in Q4 2022, compared to $182.0 million in Q4 2021 and $208.0 million in Q4 2020.