Growth Metrics

Howmet Aerospace (HWM) Construction in Progress (2016 - 2022)

Historic Construction in Progress for Howmet Aerospace (HWM) over the last 13 years, with Q4 2022 value amounting to $179.0 million.

  • Howmet Aerospace's Construction in Progress fell 164.84% to $179.0 million in Q4 2022 from the same period last year, while for Dec 2022 it was $179.0 million, marking a year-over-year decrease of 164.84%. This contributed to the annual value of $179.0 million for FY2022, which is 164.84% down from last year.
  • Latest data reveals that Howmet Aerospace reported Construction in Progress of $179.0 million as of Q4 2022, which was down 164.84% from $182.0 million recorded in Q4 2021.
  • Over the past 5 years, Howmet Aerospace's Construction in Progress peaked at $767.0 million during Q2 2019, and registered a low of $179.0 million during Q4 2022.
  • Over the past 5 years, Howmet Aerospace's median Construction in Progress value was $415.0 million (recorded in 2019), while the average stood at $461.6 million.
  • Per our database at Business Quant, Howmet Aerospace's Construction in Progress crashed by 4987.95% in 2020 and then tumbled by 164.84% in 2022.
  • Howmet Aerospace's Construction in Progress (Quarter) stood at $739.0 million in 2018, then tumbled by 43.84% to $415.0 million in 2019, then plummeted by 49.88% to $208.0 million in 2020, then dropped by 12.5% to $182.0 million in 2021, then decreased by 1.65% to $179.0 million in 2022.
  • Its Construction in Progress stands at $179.0 million for Q4 2022, versus $182.0 million for Q4 2021 and $208.0 million for Q4 2020.