Howmet Aerospace (HWM) Construction in Progress (2016 - 2022)
Howmet Aerospace (HWM) has disclosed Construction in Progress for 13 consecutive years, with $179.0 million as the latest value for Q4 2022.
- Quarterly Construction in Progress fell 1.65% to $179.0 million in Q4 2022 from the year-ago period, while the trailing twelve-month figure was $179.0 million through Dec 2022, down 1.65% year-over-year, with the annual reading at $179.0 million for FY2022, 1.65% down from the prior year.
- Construction in Progress hit $179.0 million in Q4 2022 for Howmet Aerospace, down from $182.0 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $767.0 million in Q2 2019 to a low of $179.0 million in Q4 2022.
- Historically, Construction in Progress has averaged $461.6 million across 5 years, with a median of $415.0 million in 2019.
- Biggest five-year swings in Construction in Progress: tumbled 49.88% in 2020 and later decreased 1.65% in 2022.
- Year by year, Construction in Progress stood at $739.0 million in 2018, then tumbled by 43.84% to $415.0 million in 2019, then plummeted by 49.88% to $208.0 million in 2020, then dropped by 12.5% to $182.0 million in 2021, then fell by 1.65% to $179.0 million in 2022.
- Business Quant data shows Construction in Progress for HWM at $179.0 million in Q4 2022, $182.0 million in Q4 2021, and $208.0 million in Q4 2020.