Worthington Steel (WS) Construction in Progress (2023 - 2025)
Worthington Steel's Construction in Progress history spans 3 years, with the latest figure at $170.0 million for Q4 2025.
- For Q4 2025, Construction in Progress rose 54.55% year-over-year to $170.0 million; the TTM value through Nov 2025 reached $170.0 million, up 54.55%, while the annual FY2025 figure was $132.7 million, 58.73% up from the prior year.
- Construction in Progress for Q4 2025 was $170.0 million at Worthington Steel, up from $151.7 million in the prior quarter.
- Across five years, Construction in Progress topped out at $170.0 million in Q4 2025 and bottomed at $20.3 million in Q2 2023.
- The 3-year median for Construction in Progress is $104.6 million (2024), against an average of $97.1 million.
- The largest annual shift saw Construction in Progress skyrocketed 311.82% in 2024 before it skyrocketed 53.08% in 2025.
- A 3-year view of Construction in Progress shows it stood at $42.1 million in 2023, then skyrocketed by 161.28% to $110.0 million in 2024, then skyrocketed by 54.55% to $170.0 million in 2025.
- Per Business Quant, the three most recent readings for WS's Construction in Progress are $170.0 million (Q4 2025), $151.7 million (Q3 2025), and $132.7 million (Q2 2025).