Worthington Steel (WS) Construction in Progress (2023 - 2026)
Worthington Steel (WS) has disclosed Construction in Progress for 4 consecutive years, with $182.9 million as the latest value for Q1 2026.
- Quarterly Construction in Progress rose 61.72% to $182.9 million in Q1 2026 from the year-ago period, while the trailing twelve-month figure was $182.9 million through Feb 2026, up 61.72% year-over-year, with the annual reading at $132.7 million for FY2025, 58.73% up from the prior year.
- Construction in Progress hit $182.9 million in Q1 2026 for Worthington Steel, up from $170.0 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $182.9 million in Q1 2026 to a low of $20.3 million in Q2 2023.
- Historically, Construction in Progress has averaged $104.9 million across 4 years, with a median of $110.0 million in 2024.
- Biggest five-year swings in Construction in Progress: surged 311.82% in 2024 and later surged 53.08% in 2025.
- Year by year, Construction in Progress stood at $42.1 million in 2023, then surged by 161.28% to $110.0 million in 2024, then surged by 54.55% to $170.0 million in 2025, then grew by 7.59% to $182.9 million in 2026.
- Business Quant data shows Construction in Progress for WS at $182.9 million in Q1 2026, $170.0 million in Q4 2025, and $151.7 million in Q3 2025.