Worthington Steel (WS) Construction in Progress (2023 - 2025)
Historic Construction in Progress for Worthington Steel (WS) over the last 3 years, with Q4 2025 value amounting to $170.0 million.
- Worthington Steel's Construction in Progress rose 5454.55% to $170.0 million in Q4 2025 from the same period last year, while for Nov 2025 it was $170.0 million, marking a year-over-year increase of 5454.55%. This contributed to the annual value of $132.7 million for FY2025, which is 5873.21% up from last year.
- According to the latest figures from Q4 2025, Worthington Steel's Construction in Progress is $170.0 million, which was up 5454.55% from $151.7 million recorded in Q3 2025.
- Worthington Steel's 5-year Construction in Progress high stood at $170.0 million for Q4 2025, and its period low was $20.3 million during Q2 2023.
- For the 3-year period, Worthington Steel's Construction in Progress averaged around $97.1 million, with its median value being $104.6 million (2024).
- In the last 5 years, Worthington Steel's Construction in Progress skyrocketed by 31182.27% in 2024 and then surged by 5307.77% in 2025.
- Quarter analysis of 3 years shows Worthington Steel's Construction in Progress stood at $42.1 million in 2023, then surged by 161.28% to $110.0 million in 2024, then skyrocketed by 54.55% to $170.0 million in 2025.
- Its Construction in Progress stands at $170.0 million for Q4 2025, versus $151.7 million for Q3 2025 and $132.7 million for Q2 2025.