Wabash National (WNC) Construction in Progress (2016 - 2018)
Wabash National's Construction in Progress history spans 8 years, with the latest figure at $31.8 million for Q4 2018.
- For Q4 2018, Construction in Progress rose 79.79% year-over-year to $31.8 million; the TTM value through Dec 2018 reached $31.8 million, up 79.79%, while the annual FY2018 figure was $31.8 million, 79.79% up from the prior year.
- Construction in Progress reached $31.8 million in Q4 2018 per WNC's latest filing, up from $17.7 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $31.8 million in Q4 2018 to a low of $10.5 million in Q4 2014.
- Average Construction in Progress over 5 years is $17.2 million, with a median of $13.7 million recorded in 2015.
- Peak YoY movement for Construction in Progress: dropped 11.83% in 2016, then soared 79.79% in 2018.
- A 5-year view of Construction in Progress shows it stood at $10.5 million in 2014, then skyrocketed by 30.64% to $13.7 million in 2015, then fell by 11.83% to $12.1 million in 2016, then surged by 45.86% to $17.7 million in 2017, then skyrocketed by 79.79% to $31.8 million in 2018.
- Per Business Quant, the three most recent readings for WNC's Construction in Progress are $31.8 million (Q4 2018), $17.7 million (Q4 2017), and $12.1 million (Q4 2016).