Growth Metrics

Wabash National (WNC) Construction in Progress (2016 - 2018)

Wabash National filings provide 8 years of Construction in Progress readings, the most recent being $31.8 million for Q4 2018.

  • Quarterly Construction in Progress rose 79.79% to $31.8 million in Q4 2018 from the year-ago period, while the trailing twelve-month figure was $31.8 million through Dec 2018, up 79.79% year-over-year, with the annual reading at $31.8 million for FY2018, 79.79% up from the prior year.
  • Construction in Progress hit $31.8 million in Q4 2018 for Wabash National, up from $17.7 million in the prior quarter.
  • Across five years, Construction in Progress topped out at $31.8 million in Q4 2018 and bottomed at $10.5 million in Q4 2014.
  • Average Construction in Progress over 5 years is $17.2 million, with a median of $13.7 million recorded in 2015.
  • The largest annual shift saw Construction in Progress dropped 11.83% in 2016 before it soared 79.79% in 2018.
  • Wabash National's Construction in Progress stood at $10.5 million in 2014, then soared by 30.64% to $13.7 million in 2015, then decreased by 11.83% to $12.1 million in 2016, then skyrocketed by 45.86% to $17.7 million in 2017, then soared by 79.79% to $31.8 million in 2018.
  • Per Business Quant, the three most recent readings for WNC's Construction in Progress are $31.8 million (Q4 2018), $17.7 million (Q4 2017), and $12.1 million (Q4 2016).