Wabash National (WNC) Construction in Progress (2016 - 2018)
Historic Construction in Progress for Wabash National (WNC) over the last 8 years, with Q4 2018 value amounting to $31.8 million.
- Wabash National's Construction in Progress rose 7978.72% to $31.8 million in Q4 2018 from the same period last year, while for Dec 2018 it was $31.8 million, marking a year-over-year increase of 7978.72%. This contributed to the annual value of $31.8 million for FY2018, which is 7978.72% up from last year.
- Wabash National's Construction in Progress amounted to $31.8 million in Q4 2018, which was up 7978.72% from $17.7 million recorded in Q4 2017.
- Wabash National's Construction in Progress' 5-year high stood at $31.8 million during Q4 2018, with a 5-year trough of $10.5 million in Q4 2014.
- Moreover, its 5-year median value for Construction in Progress was $13.7 million (2015), whereas its average is $17.2 million.
- Per our database at Business Quant, Wabash National's Construction in Progress crashed by 1182.59% in 2016 and then skyrocketed by 7978.72% in 2018.
- Quarter analysis of 5 years shows Wabash National's Construction in Progress stood at $10.5 million in 2014, then surged by 30.64% to $13.7 million in 2015, then dropped by 11.83% to $12.1 million in 2016, then surged by 45.86% to $17.7 million in 2017, then surged by 79.79% to $31.8 million in 2018.
- Its Construction in Progress stands at $31.8 million for Q4 2018, versus $17.7 million for Q4 2017 and $12.1 million for Q4 2016.