Advanced Drainage Systems (WMS) Construction in Progress (2017 - 2021)
Advanced Drainage Systems' Construction in Progress history spans 8 years, with the latest figure at $71.9 million for Q1 2021.
- For Q1 2021, Construction in Progress rose 260.72% year-over-year to $71.9 million; the TTM value through Mar 2021 reached $71.9 million, up 260.72%, while the annual FY2021 figure was $71.9 million, 260.72% up from the prior year.
- Construction in Progress reached $71.9 million in Q1 2021 per WMS's latest filing, up from $19.9 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $71.9 million in Q1 2021 to a low of $6.6 million in Q1 2018.
- Average Construction in Progress over 5 years is $26.4 million, with a median of $19.7 million recorded in 2019.
- Peak YoY movement for Construction in Progress: crashed 52.88% in 2018, then surged 260.72% in 2021.
- A 5-year view of Construction in Progress shows it stood at $14.0 million in 2017, then plummeted by 52.88% to $6.6 million in 2018, then skyrocketed by 198.91% to $19.7 million in 2019, then increased by 0.89% to $19.9 million in 2020, then soared by 260.72% to $71.9 million in 2021.
- Per Business Quant, the three most recent readings for WMS's Construction in Progress are $71.9 million (Q1 2021), $19.9 million (Q1 2020), and $19.7 million (Q1 2019).