Growth Metrics

Warner Bros. Discovery (WBD) Construction in Progress (2020 - 2023)

Warner Bros. Discovery's Construction in Progress history spans 4 years, with the latest figure at $344.0 million for Q4 2023.

  • For Q4 2023, Construction in Progress fell 39.44% year-over-year to $344.0 million; the TTM value through Dec 2023 reached $344.0 million, down 39.44%, while the annual FY2023 figure was $344.0 million, 39.44% down from the prior year.
  • Construction in Progress reached $344.0 million in Q4 2023 per WBD's latest filing, down from $568.0 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $568.0 million in Q4 2022 to a low of $141.0 million in Q4 2021.
  • Average Construction in Progress over 4 years is $334.5 million, with a median of $314.5 million recorded in 2020.
  • Peak YoY movement for Construction in Progress: tumbled 50.53% in 2021, then skyrocketed 302.84% in 2022.
  • A 4-year view of Construction in Progress shows it stood at $285.0 million in 2020, then crashed by 50.53% to $141.0 million in 2021, then surged by 302.84% to $568.0 million in 2022, then crashed by 39.44% to $344.0 million in 2023.
  • Per Business Quant, the three most recent readings for WBD's Construction in Progress are $344.0 million (Q4 2023), $568.0 million (Q4 2022), and $141.0 million (Q4 2021).