Vse VSEC
NASDAQ VSEC
$217.58 +3.07 (+1.43%)
At close: Aug 21, 2026 · 4:00 PM EDT

Vse (VSEC) Liabilities from Discontinued Operations (2012 - 2025)

Vse (VSEC) posted Liabilities from Discontinued Operations of 53034000.0 for Q1 2025, down 22.24% sequentially from 68200000.0 in Q4 2024.

Vse (VSEC) Liabilities from Discontinued Operations (2012 - 2025) Analysis & Trends

Vse has reported Liabilities from Discontinued Operations for 6 years, with the latest figure at 53034000.0 in Q1 2025.

  • Quarterly Liabilities from Discontinued Operations changed N/A year-over-year to 53034000.0 in Q1 2025, while the trailing twelve-month figure through Mar 2025 was 53034000.0 (changed N/A YoY) and the FY2024 annual result came in at 68200000.0, up 27.74% from the prior year.
  • Liabilities from Discontinued Operations eased to 53034000.0 in Q1 2025 per VSEC's latest filing, from 68200000.0 in the prior quarter.
  • Over five years, Liabilities from Discontinued Operations peaked at 68200000.0 in Q4 2024 and troughed at 18048000.0 in Q4 2022.
  • A 4-year average of 50614200.0 and a median of 53391000.0 in 2023 frame the typical range for Liabilities from Discontinued Operations.
  • The sharpest annual moves came in 2023 and 2024: Liabilities from Discontinued Operations soared 195.83% in 2023, then gained 27.74% in 2024.
  • Over 4 years, Liabilities from Discontinued Operations stood at 18048000.0 in 2022, then jumped by 195.83% to 53391000.0 in 2023, then increased by 27.74% to 68200000.0 in 2024, then dropped by 22.24% to 53034000.0 in 2025.
  • According to Business Quant data, Liabilities from Discontinued Operations over the past three periods registered 53034000.0, 68200000.0, and 53391000.0 for Q1 2025, Q4 2024, and Q4 2023 respectively.

Peer Comparison

# Company Market Cap Enterprise Value Gross Profit (Qtr)
1 General Electric 362.92 Bn 353.58 Bn 6.95 Bn
2 Rtx 284.24 Bn 275.94 Bn 9.91 Bn
3 Boeing 169.32 Bn 149.30 Bn 2.41 Bn
4 Lockheed Martin 129.93 Bn 126.14 Bn 2.45 Bn
5 Howmet Aerospace 108.64 Bn 108.07 Bn 951.00 Mn
6 General Dynamics 103.62 Bn 99.29 Bn 6.76 Bn
7 Northrop Grumman 78.44 Bn 76.14 Bn 3.72 Bn
8 TransDigm 69.14 Bn 66.37 Bn 1.63 Bn
9 Axon Enterprise 50.64 Bn 49.97 Bn 546.45 Mn
10 Vse 6.76 Bn 6.68 Bn 243.53 Mn

Historic Data

Download Data
DateValue
Mar 31, 2025 53.03 Mn
Mar 31, 2025 53.03 Mn
Dec 31, 2024 68.20 Mn
Dec 31, 2024 68.20 Mn
Dec 31, 2023 53.39 Mn
Dec 31, 2023 53.39 Mn
Sep 30, 2023 60.40 Mn
Sep 30, 2023 60.40 Mn
Dec 31, 2022 18.05 Mn
Dec 31, 2022 18.05 Mn
Sep 30, 2013 385,000.00
Sep 30, 2013 385,000.00
Jun 30, 2013 380,000.00
Jun 30, 2013 380,000.00
Mar 31, 2013 511,000.00
Mar 31, 2013 511,000.00
Dec 31, 2012 551,000.00
Dec 31, 2012 551,000.00