Growth Metrics

Victoria's Secret (VSCO) Construction in Progress (2021 - 2025)

Historic Construction in Progress for Victoria's Secret (VSCO) over the last 5 years, with Q1 2025 value amounting to $27.0 million.

  • Victoria's Secret's Construction in Progress rose 384.62% to $27.0 million in Q1 2025 from the same period last year, while for Feb 2025 it was $27.0 million, marking a year-over-year increase of 384.62%. This contributed to the annual value of $27.0 million for FY2025, which is 384.62% up from last year.
  • Per Victoria's Secret's latest filing, its Construction in Progress stood at $27.0 million for Q1 2025, which was up 384.62% from $26.0 million recorded in Q1 2024.
  • Victoria's Secret's 5-year Construction in Progress high stood at $78.0 million for Q1 2022, and its period low was $23.0 million during Q1 2021.
  • Over the past 5 years, Victoria's Secret's median Construction in Progress value was $27.0 million (recorded in 2025), while the average stood at $42.2 million.
  • Per our database at Business Quant, Victoria's Secret's Construction in Progress surged by 23913.04% in 2022 and then crashed by 5438.6% in 2024.
  • Over the past 5 years, Victoria's Secret's Construction in Progress (Quarter) stood at $23.0 million in 2021, then soared by 239.13% to $78.0 million in 2022, then decreased by 26.92% to $57.0 million in 2023, then tumbled by 54.39% to $26.0 million in 2024, then increased by 3.85% to $27.0 million in 2025.
  • Its Construction in Progress stands at $27.0 million for Q1 2025, versus $26.0 million for Q1 2024 and $57.0 million for Q1 2023.