Growth Metrics

Urban Outfitters (URBN) Construction in Progress (2017 - 2026)

Urban Outfitters' Construction in Progress history spans 16 years, with the latest figure at $138.3 million for Q1 2026.

  • For Q1 2026, Construction in Progress rose 76.52% year-over-year to $138.3 million; the TTM value through Jan 2026 reached $138.3 million, up 76.52%, while the annual FY2026 figure was $138.3 million, 76.52% up from the prior year.
  • Construction in Progress reached $138.3 million in Q1 2026 per URBN's latest filing, up from $78.3 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $358.8 million in Q1 2023 to a low of $78.3 million in Q1 2025.
  • Average Construction in Progress over 5 years is $188.2 million, with a median of $138.3 million recorded in 2026.
  • Peak YoY movement for Construction in Progress: plummeted 73.2% in 2024, then skyrocketed 76.52% in 2026.
  • A 5-year view of Construction in Progress shows it stood at $269.6 million in 2022, then soared by 33.08% to $358.8 million in 2023, then tumbled by 73.2% to $96.2 million in 2024, then decreased by 18.52% to $78.3 million in 2025, then surged by 76.52% to $138.3 million in 2026.
  • Per Business Quant, the three most recent readings for URBN's Construction in Progress are $138.3 million (Q1 2026), $78.3 million (Q1 2025), and $96.2 million (Q1 2024).