Urban Outfitters (URBN) Construction in Progress (2017 - 2026)
Urban Outfitters filings provide 16 years of Construction in Progress readings, the most recent being $138.3 million for Q1 2026.
- On a quarterly basis, Construction in Progress rose 76.52% to $138.3 million in Q1 2026 year-over-year; TTM through Jan 2026 was $138.3 million, a 76.52% increase, with the full-year FY2026 number at $138.3 million, up 76.52% from a year prior.
- Construction in Progress hit $138.3 million in Q1 2026 for Urban Outfitters, up from $78.3 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $358.8 million in Q1 2023 to a low of $78.3 million in Q1 2025.
- Median Construction in Progress over the past 5 years was $138.3 million (2026), compared with a mean of $188.2 million.
- Biggest five-year swings in Construction in Progress: tumbled 73.2% in 2024 and later surged 76.52% in 2026.
- Urban Outfitters' Construction in Progress stood at $269.6 million in 2022, then soared by 33.08% to $358.8 million in 2023, then tumbled by 73.2% to $96.2 million in 2024, then decreased by 18.52% to $78.3 million in 2025, then surged by 76.52% to $138.3 million in 2026.
- The last three reported values for Construction in Progress were $138.3 million (Q1 2026), $78.3 million (Q1 2025), and $96.2 million (Q1 2024) per Business Quant data.