Growth Metrics

Abercrombie & Fitch (ANF) Construction in Progress (2017 - 2026)

Abercrombie & Fitch (ANF) has disclosed Construction in Progress for 16 consecutive years, with $83.0 million as the latest value for Q1 2026.

  • Quarterly Construction in Progress rose 101.61% to $83.0 million in Q1 2026 from the year-ago period, while the trailing twelve-month figure was $83.0 million through Jan 2026, up 101.61% year-over-year, with the annual reading at $83.0 million for FY2026, 101.61% up from the prior year.
  • Construction in Progress hit $83.0 million in Q1 2026 for Abercrombie & Fitch, up from $41.2 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $83.0 million in Q1 2026 to a low of $9.5 million in Q1 2022.
  • Historically, Construction in Progress has averaged $49.4 million across 5 years, with a median of $44.4 million in 2024.
  • Biggest five-year swings in Construction in Progress: crashed 58.31% in 2022 and later soared 627.45% in 2023.
  • Year by year, Construction in Progress stood at $9.5 million in 2022, then skyrocketed by 627.45% to $69.0 million in 2023, then tumbled by 35.7% to $44.4 million in 2024, then dropped by 7.2% to $41.2 million in 2025, then skyrocketed by 101.61% to $83.0 million in 2026.
  • Business Quant data shows Construction in Progress for ANF at $83.0 million in Q1 2026, $41.2 million in Q1 2025, and $44.4 million in Q1 2024.