Abercrombie & Fitch (ANF) Construction in Progress (2017 - 2025)
Abercrombie & Fitch's Construction in Progress history spans 15 years, with the latest figure at $41.2 million for Q1 2025.
- For Q1 2025, Construction in Progress fell 7.2% year-over-year to $41.2 million; the TTM value through Feb 2025 reached $41.2 million, down 7.2%, while the annual FY2025 figure was $41.2 million, 7.2% down from the prior year.
- Construction in Progress for Q1 2025 was $41.2 million at Abercrombie & Fitch, down from $44.4 million in the prior quarter.
- Across five years, Construction in Progress topped out at $69.0 million in Q1 2023 and bottomed at $9.5 million in Q1 2022.
- The 5-year median for Construction in Progress is $41.2 million (2025), against an average of $37.3 million.
- The largest annual shift saw Construction in Progress tumbled 62.66% in 2021 before it surged 627.45% in 2023.
- A 5-year view of Construction in Progress shows it stood at $22.7 million in 2021, then crashed by 58.31% to $9.5 million in 2022, then soared by 627.45% to $69.0 million in 2023, then plummeted by 35.7% to $44.4 million in 2024, then fell by 7.2% to $41.2 million in 2025.
- Per Business Quant, the three most recent readings for ANF's Construction in Progress are $41.2 million (Q1 2025), $44.4 million (Q1 2024), and $69.0 million (Q1 2023).