Growth Metrics

Expedia (EXPE) Construction in Progress (2016 - 2025)

Expedia (EXPE) has disclosed Construction in Progress for 15 consecutive years, with $83.0 million as the latest value for Q4 2025.

  • On a quarterly basis, Construction in Progress fell 57.65% to $83.0 million in Q4 2025 year-over-year; TTM through Dec 2025 was $83.0 million, a 57.65% decrease, with the full-year FY2025 number at $83.0 million, down 57.65% from a year prior.
  • Construction in Progress was $83.0 million for Q4 2025 at Expedia, down from $196.0 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $196.0 million in Q4 2024 to a low of $33.0 million in Q4 2021.
  • A 5-year average of $105.2 million and a median of $83.0 million in 2025 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: soared 139.68% in 2023, then plummeted 57.65% in 2025.
  • Expedia's Construction in Progress stood at $33.0 million in 2021, then skyrocketed by 90.91% to $63.0 million in 2022, then skyrocketed by 139.68% to $151.0 million in 2023, then increased by 29.8% to $196.0 million in 2024, then plummeted by 57.65% to $83.0 million in 2025.
  • Per Business Quant, the three most recent readings for EXPE's Construction in Progress are $83.0 million (Q4 2025), $196.0 million (Q4 2024), and $151.0 million (Q4 2023).