Unilever (UNLYF) Construction in Progress (2016 - 2025)

Unilever has reported Construction in Progress over the past 10 years, most recently at $1.9 billion for Q4 2025.

  • For Q4 2025, Construction in Progress rose 32.26% year-over-year to $1.9 billion; the TTM value through Dec 2025 reached $1.9 billion, up 32.26%, while the annual FY2025 figure was $1.9 billion, 28.37% up from the prior year.
  • Construction in Progress was $1.9 billion for Q4 2025 at Unilever, up from $1.5 billion in the prior quarter.
  • Across five years, Construction in Progress topped out at $1.9 billion in Q4 2025 and bottomed at $106.1 million in Q4 2022.
  • The 5-year median for Construction in Progress is $1.1 billion (2023), against an average of $1.1 billion.
  • Year-over-year, Construction in Progress tumbled 89.47% in 2022 and then surged 971.83% in 2023.
  • Over 5 years, Construction in Progress stood at $1.0 billion in 2021, then tumbled by 89.47% to $106.1 million in 2022, then surged by 971.83% to $1.1 billion in 2023, then grew by 28.54% to $1.5 billion in 2024, then skyrocketed by 32.26% to $1.9 billion in 2025.
  • The last three reported values for Construction in Progress were $1.9 billion (Q4 2025), $1.5 billion (Q4 2024), and $1.1 billion (Q4 2023) per Business Quant data.